Laserfiche WebLink
<br />. <br /> <br />. <br /> <br />. <br /> <br />COST ESTIMATE OF PROPOSED PROJECT <br /> <br />A detailed construction cost estimate for the proposed project can be generated and provided by CWCB <br />or CDOT on request. <br /> <br />Cost Breakdown: <br /> <br />FllllclingSlllltce ' ...., ... . .. Amount ($).. .. .. <br />Applicant Share (10%) $25,000 <br />State Share/CDOT (50%) $334,440 <br />Federal Share (40%) $100,000 <br />Other Non-Federal Sources (0%) $0 <br />Total $459,440 <br /> <br />Non-FEMA Funding Sources: <br /> <br />. Prowers County Government (in-kind services for channel work) <br />. State of Colorado, Department of Transportation (engineering and cash contribution for bridge <br />replacement). <br />. Colorado Water Conservation Board (technical assistance to applicant) <br /> <br />Estimated non-Federal Expenditures: <br /> <br /> <br />Non"Cash <br />(In-kind match) <br /> <br />Bridge design and construction <br />(CDOT) <br />Channel improvements <br />labor/equipment/materials <br /> <br />$334,440 <br /> <br />$25,000 <br /> <br />Total non-Federal Expenditures = $359,440 <br />