<br />101.60 Specified Completion Date. The
<br />date on which the contract work is specified to be
<br />completed.
<br />
<br />101.61 Standard Special Provisions. See
<br />definition for Special Provisions, subsection 101.58.
<br />
<br />101.62 State. The State of Colorado acting
<br />through its authorized representative.
<br />
<br />101.63 Street. A general term denoting a pub-
<br />lic way for purposes of vehicular travel, including the
<br />entire area within the right of way.
<br />
<br />101.64 Structures. Bridges, culverts, catch
<br />basins, drop inlets, retaining walls, cribbing, man-
<br />holes, endwaIls, buildings, storm drains, service pipes,
<br />underdrains, foundation drains, fences, guard rail,
<br />signs, end sections, traffic signals, light standards
<br />and other features which may be encountered in the
<br />work and not otherwise classified.
<br />
<br />101.65 Subcontractor. An individual, firm
<br />or corporation to whom the contractorsublets part of
<br />the Contract.
<br />
<br />101.66 Subgrade. The top surface of a
<br />roadbed upon which the pavement structure,
<br />shoulders, and curbs are constructed.
<br />
<br />101.67 Substructure. All of the structure
<br />below the bearings of simple and continuous spans,
<br />skewbacks of arches and tops of footings of rigid
<br />frames, together with the backwalls, wingwalls and
<br />wing protection railings.
<br />
<br />101.68 Superintendent. The Contractor's
<br />authorized representative in responsible charge of
<br />the work.
<br />
<br />101.69 Superstructure. The entire structure
<br />except the substructure, as defined in subsection
<br />101.67.
<br />
<br />101.70 Supplemental Specifications. See
<br />definition for Specifications, subsection 101.59.
<br />
<br />101.71 Surety., Thecorporation,partnershipor
<br />ndividual, other than the Contractor, executing a
<br />ond furnished by the Contractor.
<br />
<br />101.72 Town or City. A subdivision of the
<br />ounty used to designate or identify the location of
<br />he project.
<br />
<br />101.73 Traveled Way. The portion of the
<br />roadway for the movement of vehicles, exclusive of
<br />shoulders and auxiliary lanes.
<br />
<br />101.74 Value Engineering. The systematic
<br />application of recognized techniques which identify
<br />the function of a product or service, establish a value
<br />for that function, and provide the necessary function
<br />reliably at the lowest life-cycle cost. Value eng-
<br />ineering incentive clauses will be included in the
<br />special provisions when applicable to a project.
<br />
<br />101.75 Work. The furnishing of all labor,
<br />materials, equipment, and incidentals necessary to
<br />successfully complete the project according to all
<br />duties and obligations imposed by the Contract.
<br />
<br />101.76 Working Day. Any day, exclusive of
<br />Saturdays, Sundays and holidays, on which weather
<br />and other conditions not under the control of the
<br />Contractor will permit construction operations to
<br />proceed with the normal working force engaged in
<br />performing those items controlling the completion of
<br />the work.
<br />
<br />SECTION 102
<br />BIDDING REQUIREMENTS
<br />AND CONDITIONS
<br />
<br />102.01 Prequalification of Bidders. Only
<br />prequalified bidders will be allowed to bid on any
<br />project. At least 10 days prior to opening of
<br />proposals, the bidder must file an experience
<br />questionnaire and a confidential financial state-
<br />ment on standard forms furnished by the Division.
<br />The confidential financial statement of bidders
<br />desiring to prequalify for projects $500,000 and over,
<br />must be audited by a certified public accountant
<br />(CPA) and accompanied by an affidavit by the CPA.
<br />The statement shall include a complete report of the
<br />bidder's financial resources and liabilities, equip-
<br />ment, past record, and personnel.
<br />Prequalification shall be in effect for one year
<br />except for those projects that require a special
<br />prequalification. Prequalitication may be changed
<br />during that one year period upon the submission of
<br />additional favorable reports or upon evidence of
<br />unsatisfactory performance. Prequalification shall
<br />authorize a bidder to bid on individual projects of a
<br />given size or for a particular type of work.
<br />
<br />102.02 Contents of Proposal Forms. Upon
<br />request, the Division will furnish the prospective
<br />bidder with a proposal form. This form will state the
<br />location and description of the contemplated con-
<br />struction and will show the estimate of the various
<br />quantities and types of work to be performed or
<br />materials to be furnished, and will have a schedule of
<br />items for which unit bid prices are invited. The
<br />
<br />5