My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FLOOD00689
CWCB
>
Floodplain Documents
>
Backfile
>
1-1000
>
FLOOD00689
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/23/2009 1:21:34 PM
Creation date
10/4/2006 9:25:22 PM
Metadata
Fields
Template:
Floodplain Documents
Designation Number
136
County
Arapahoe
Community
Littleton
Stream Name
Slaughterhouse Gulch
Title
Major Drainageway Planning - Slaughterhouse Gulch, Littleton
Date
5/1/1974
Designation Date
5/1/1979
Floodplain - Doc Type
Floodplain Report/Masterplan
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
99
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />As can be seen, the difference in costs between the Interim <br />Report and the Final Report cost estimate on the channel is <br />considerably different. We attribute this to lack of detailed <br />information at the time of the Interim Report cost estimate. <br />Rip rap cost, drop structure cost and excavation cost, because <br />of the Denver Water Board conduit, are the contributing factors <br />for the increased costs. This increase in cost, however, will <br />not change the alternate selection for the final design as in <br />all alternates, the channel costs would have to be increased <br />by the difference shown on the previous tables. <br /> <br />TABLE X <br />COST COMPARISONS <br /> <br />Main Stream <br /> <br />Items <br /> <br />Interim Report Final Report <br />$ 10,000 $110,400 <br />158,000 150,200 <br />o 10,400 <br />108,400 <br /> <br />Channel <br /> <br />Street & Crossing Improvements <br /> <br />Rights-of-Way <br />40% Contingency <br />Total <br /> <br />$168,000 <br /> <br />$379,400 <br /> <br />Items <br /> <br />South Tributary <br />Interim Report Final Report <br /> <br />Street & Crossing Improvements <br /> <br />o <br />$130,000 <br />o <br /> <br />$ 8,000 <br />94,700 <br /> <br />Channel <br /> <br />Rights-of-Way <br /> <br />o <br /> <br />$130,000 <br /> <br />41,100 <br />$143,800 <br /> <br />40% Contingency <br />Total <br /> <br />X-3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.