My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FLOOD00689
CWCB
>
Floodplain Documents
>
Backfile
>
1-1000
>
FLOOD00689
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/23/2009 1:21:34 PM
Creation date
10/4/2006 9:25:22 PM
Metadata
Fields
Template:
Floodplain Documents
Designation Number
136
County
Arapahoe
Community
Littleton
Stream Name
Slaughterhouse Gulch
Title
Major Drainageway Planning - Slaughterhouse Gulch, Littleton
Date
5/1/1974
Designation Date
5/1/1979
Floodplain - Doc Type
Floodplain Report/Masterplan
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
99
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />SECTION X <br />COSTS <br /> <br />Estimated cost for construction, engineering, legal and mis- <br />cellaneous costs are included in this section. Construction <br />costs are based on use of materials and techniques indicated <br />on the plans . Alternate types of materials often exist and <br />some savings in final design may result by carefully evaluat- <br />ing alternate materials. <br /> <br />A. UNIT COSTS <br /> <br />Unit costs used for estimating purposes are indicated in <br />Table VIII. Miscellaneous costs not noted in the table are <br />normally based on the 1973 cost data book published by the <br />Cost Estimate Unit of the Staff Design Division, Colorado <br />. Department of Highways or Building Construction Cost Data, <br />1974, published by Robert Snow Means Company, Inc. <br /> <br />TABLE VIII <br /> <br />UNIT PRICES USED FOR ESTIMATED CONSTRUCTION COSTS <br /> <br />Item <br /> <br />Excavation & Disposal in Urban Areas <br />Excavation, Structural <br />Regular Rip Rap <br />Seeding (Dry Land Grasses) <br />Drop Structures (Gab ion) <br />Removal & Replacement of Street Surfaces <br />(Asphal t) <br />Sidewalk & Curb & Gutter Removal & Hauling <br />Sidewalk & Curb & Gutter Replacement <br />20' Combination Inlets <br />10' Combination Inlets <br />Water Line Installation 6 inch DIP <br />Sewer Installation, a inch VCP <br />Manhole Installation <br />Telephone Manhole Adjustment <br />Sewer Manhole Adjustment <br />Traffic Signal Reinstallation <br />Reinforced Concrete Pipe (Price does <br />not include excavation & backfill) 36" RCP <br /> <br />X-I <br /> <br />Unit Cost <br /> <br />$ 1.SO/cu. yd. <br />3.DO/cu. yd. <br />6D.DD/cu. yd. <br />600.0D/acre <br />4;000.OD/each <br /> <br />7.00/sq. yd. <br />a.DO/lin. ft. <br />8.0D/lin. ft. <br />3,SDO.DD/each <br />2,DDO.00/each <br />7.DO/lin. ft. <br />7.80/lin. ft. <br />SSO.DO/each <br />4DD.00/each <br />2SD.OD/each <br />S,OOD.OO/each <br /> <br />2S.00/lin. ft. <br />
The URL can be used to link to this page
Your browser does not support the video tag.