Laserfiche WebLink
<br />equipment to install the two (2) <br />cated on the drawings. <br /> <br />barricade posts as indi- <br /> <br />Payment shall be made on a lump sum basis when completed. <br /> <br />22. Slope Face GaaeRod <br /> <br />The Contractor shall provide <br />equipment to install the gage <br />indicated on the Drawings. <br /> <br />all materials, labor and <br />rod and support piers as <br /> <br />Payment shall be made on a lump sum basis when completed. <br /> <br />23. Riprap Beddin~ <br /> <br />The Contractor shall supply and place riprap bedding in all <br />locations indicated on the Drawings inclUding but not <br />limited to the upstream face of the dam, the upstream face <br />or the retaining berms, in the spillway channel and in the <br />outlet channel. <br /> <br />Payment shall be based on a unit price basis per cubic yard <br />of material staked as computed from the average end area <br />method as taken from the field survey cross section <br />measurements taken at approximately 100 foot intervals. <br /> <br />24. Class 18 Riprap <br /> <br />The Contractor shall supply and place Class 18 riprap in <br />locations indicated on the Drawings including but <br />limited to the upstream face of the dam, the upstream <br />of the retaining berms, and in the spillway channel. <br /> <br />all <br />not <br />face <br /> <br />Payment shall be based on a unit price basis per cubic yard <br />of material staked as computed from the average end area <br />method as taken from the field survey cross section <br />measurements taken at approximately 100 foot intervals. <br /> <br />25. Class 12 Riprap <br /> <br />The Contractor shall supply and place Class 12 riprap in the <br />outlet channel as indicated on the drawings. <br /> <br />Payment shall be based on a unit price basis per cubic yard <br />of material staked as computed from the average end area <br />method as taken from the field survey cross section <br />measurements taken at approximately 100 foot intervals. <br /> <br />26. Horizontal Blanket <br /> <br />The Contractor shall supply, place, and compact Filter <br />Material Type I in a horizontal blanket at the locations <br /> <br />CD-12 <br />