My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FLOOD00634
CWCB
>
Floodplain Documents
>
Backfile
>
1-1000
>
FLOOD00634
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/23/2009 1:21:37 PM
Creation date
10/4/2006 9:24:04 PM
Metadata
Fields
Template:
Floodplain Documents
County
Larimer
Community
Wellington
Title
Appendix A Construction Fund Loan Application
Date
12/19/1989
Prepared For
Wellington
Prepared By
Consultants
Floodplain - Doc Type
Community File
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
89
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />'. <br /> <br />indicated on the Drawings. <br /> <br />Payment shall be made on a lump sum basis with progress <br />payments made basis on percentage of total work completed. <br /> <br />27. Piezometers <br /> <br />The Contractor shall supply all pipe, fittings, sand, <br />casing, grout, drilling, and all other materials, equipment, <br />and labor required to survey and install the piezometers in <br />the locations indicated on the Drawings or as directed by <br />the Engineer. <br /> <br />Payment shall be made on a unit price basis for each <br />piezometer installed. <br /> <br />28. Survey Monuments <br /> <br />The Contractor shall supply all materials, labor and <br />equipment to survey and install the survey monuments in the <br />locations indicated on the Drawings. <br /> <br />Payment shall be <br />monument installed <br />Engineer. <br /> <br />made <br />per the <br /> <br />on a unit <br />Drawings or <br /> <br />price basis for each <br />as directed by the <br /> <br />Total Contract Amount for Schedule "A" <br /> <br />Schedule "B" items: <br /> <br />It is understood and agreed that the unit adjustment prices <br />from Schedule "B" shall be used for additions or deductions <br />from the quantities specified in Schedule "A". Each unit <br />price shall include all costs for furnishing and installing <br />the item and shall apply the same meaning and scope of work <br />as the corresponding item in Schedule "A" where appropriate. <br />Additional unit prices listed which do not correspond to <br />items in Schedule "A" are included for those items of work <br />where an addition or deduction to the Contract may be antic- <br />ipated. <br /> <br />CD-13 <br />
The URL can be used to link to this page
Your browser does not support the video tag.