Laserfiche WebLink
<br />the 16" Plastic Pipe complete from the Gatehouse to the <br />existing pump facility. <br /> <br />Payment shall be made on a lump sum basis with progress <br />payments made based on percentage of total work completed. <br /> <br />17.._16" Slide Gate <br /> <br />The Contractor shall supply and provide complete installa- <br />tion of a 16" x 16" vertical slide gate including but not <br />limited to the gate, thimble, the gate operator, gate stem <br />and stem support brackets, and all accessories, materials, <br />and labor required for installation as shown on the <br />Drawings. <br /> <br />Payment shall be made on a lump sum basis with progress <br />payments made based on percentage of total work completed. <br /> <br />18, 42" Slide Gate <br /> <br />The Contractor shall supply and provide complete installa- <br />tion of a 42" x 42" vertical slide gate including but not <br />limited to the gate, thimble, gate operator, gate stem and <br />stem support brackets, and all accessories, materials, and <br />labor required for installation as shown on the Drawings. <br /> <br />Payment shall be made on a lump sum basis with progress <br />payments made based on percentage of total work completed. <br /> <br />19. Aaareaate Surfacina <br /> <br />The Contractor shall supply, place, and compact Class 4 <br />roadbase on the dam crest roadway and the West retaining <br />berm as shown and in the locations indicated on the <br />Drawings. Placement shall include all work necessary to <br />properly shape and compact the subgrade and shall include <br />all materials, labor, and equipment required. <br /> <br />Payment shall be made on a lump sum basis with progress <br />payments made based on percentage of total work completed. <br /> <br />20. Erosion Control <br /> <br />The Contractor shall apply erosion control seeding and <br />placement of topsoil in all areas disturbed by Construction. <br /> <br />Payment shall be made on a lump sum basis with progress <br />payments made based on percentage of total work completed. <br /> <br />21. Road Barricade Posts <br /> <br />The contractor shall provide all materials, labor and <br /> <br />CD-ll <br />