My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FLOOD00634
CWCB
>
Floodplain Documents
>
Backfile
>
1-1000
>
FLOOD00634
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/23/2009 1:21:37 PM
Creation date
10/4/2006 9:24:04 PM
Metadata
Fields
Template:
Floodplain Documents
County
Larimer
Community
Wellington
Title
Appendix A Construction Fund Loan Application
Date
12/19/1989
Prepared For
Wellington
Prepared By
Consultants
Floodplain - Doc Type
Community File
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
89
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />from the average end area method as taken from the field <br />survey cross section measurements taken at approximately 100 <br />foot intervals. <br /> <br />7. Sediment Removal <br /> <br />The Contractor shall remove and spoil sediment at the <br />upstream toe of the dam as required to reach the original <br />ground surface as directed by the ENGINEER. The sediment <br />shall be spoiled at the location shown on the Drawings. <br /> <br />Payment of this item shall be based on a unit price basis <br />per cubic yard of material staked for excavation as computed <br />from the average end area method as taken from the field <br />survey cross section measurements taken at approximately 100 <br />foot intervals. <br /> <br />8. General Embankment Fill <br /> <br />The Contractor shall fill the upstream and downstream zones <br />of the dam, the retaining berms, and the outlet channel as <br />shown on the Drawings. All costs associated with placement <br />and compaction of the fill shall be included. This item is <br />limited to embankment type fill and does not include fill <br />around structures. <br /> <br />Payment for this item shall be based on a unit price basis <br />per cubic yard of material staked for fill as computed from <br />the average end area method as taken from the field survey <br />cross section measurements taken at approximately 100 foot <br />intervals. <br /> <br />9. Toe Drains <br /> <br />The Contractor shall supply all piping, materials, fittings, <br />sand and gravel, excavation, placement and compaction of <br />materials required to install the toe drains. Any sheeting, <br />shoring, or special dewatering to stabilize the excavation <br />shall be included in the cost. <br /> <br />Payment shall be made on a lump sum basis with progress <br />payments made based on percentage of total work completed. <br /> <br />10. Outlet Channel Drains <br /> <br />The Contractor shall supply all piping, fittings, sand, <br />excavation, placement, and compaction of materials required <br />to install the drains on both sides of the outlet channel. <br />Any sheeting, shoring, or dewatering required to stabilize <br />the excavation shall be included in the cost. <br /> <br />CD-9 <br />
The URL can be used to link to this page
Your browser does not support the video tag.