My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FLOOD00634
CWCB
>
Floodplain Documents
>
Backfile
>
1-1000
>
FLOOD00634
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/23/2009 1:21:37 PM
Creation date
10/4/2006 9:24:04 PM
Metadata
Fields
Template:
Floodplain Documents
County
Larimer
Community
Wellington
Title
Appendix A Construction Fund Loan Application
Date
12/19/1989
Prepared For
Wellington
Prepared By
Consultants
Floodplain - Doc Type
Community File
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
89
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />outlet works including the existing flume, intake, gate- <br />house, outlet structure, and small diameter irrigation line; <br />removing and grouting the six (6) existing piezometers; <br />removing all the existing riprap and concrete facing on the <br />dam; clearing and grubbing and refilling the two swampy <br />areas below the dam as indicated on the drawings; and <br />spoiling all nonusable materials in the location indicated <br />on the drawings. <br /> <br />Payment shall be made on a lump sum basis with progress <br />payments made based on percent of total work completed. <br /> <br />~ Outlet Works Excavation <br /> <br />This item shall include all work necessary to breach the dam <br />including excavation, stockpiling of materials excavated, <br />spoiling of any nonusable materials, and any temporary <br />bracing of the excavation or dewatering required to <br />stabilize the excavation. <br /> <br />Payment of this item shall be based on a unit price basis <br />per cubic yard of material staked for excavation as computed <br />from the average end area method as taken from the field <br />survey cross section measurements taken at approximately 100 <br />foot intervals. <br /> <br />5. Unclassified Earth Excavation <br /> <br />This item of work shall include all general excavation <br />associated with the dam embankment excavation, the inspec- <br />tion trench excavation, the retaining berms, spillway <br />channel excavation, and outlet channel excavation. <br />Excavation for structures shall be included with the cost <br />item for that structure and not included in this item. <br /> <br />Payment for this item shall be based on a unit price basis <br />per cubic yard of material staked for excavation as computed <br />from the average end area method as taken from the field <br />survey cross section measurements taken at approximately 100 <br />foot intervals. <br /> <br />6. Borrow Excavation <br /> <br />This item shall include all costs to <br />materials from the location shown on <br />transport the materials to the dam site. <br />approved by the ENGINEER will be paid for. <br />convenience will be at the Contractor's <br />expense. <br /> <br />excavate borrow <br />the drawings and <br />Only borrow as <br />Borrowing out of <br />option and own <br /> <br />Payment for this item shall be based on a unit price basis <br />per cubic yard of material staked for excavation as computed <br /> <br />CD-8 <br />
The URL can be used to link to this page
Your browser does not support the video tag.