Laserfiche WebLink
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />ing of such bonds is stipulated hereinafter in Article 9, <br />the cost shall be included in the Bid. <br />7.1.2 If the Owner has reserved the right to require that <br />bonds be furnished subsequent to Ihe execution of the <br />Contract, Ihe cost shall be adjusted as provided in the <br />Contract Documents. <br />7.1.3 If the Owner requires that bonds be obtained from <br />other than the Bidder's usual source, any change in cost <br />will be adjusled as provided in the Contract Documents. <br /> <br />7.2 TIME OF DELIVERY AND FORM OF BONDS <br /> <br />7.2.1 The Bidder shail deliver the required bonds to the <br />Owner not later than the date of execution of the Con- <br />tract, or if the Work is to be commenced prior thereto in <br />response to a letter of intent. the Bidder shall, prior to <br />commencement of the Work, submit evidence satisfactory <br />to the Owner that such bonds will be furnished. <br />7.2.2 Unless otherwise required in Article 9, the bonds <br /> <br />shall be written on AlA Document A311, Performance <br />Bond and Labor and MaleriaJ Payment Bond. <br />7.2.3 The Bidder shall require the attorney-in-fact who <br />executes the reqUired bonds on behalf of the surety to <br />affix thereto a certified and current copy of his power <br />of attorney. <br /> <br />ARTICLE 8 <br /> <br />FORM OF AGREEMENT BETWEEN OWNER AND <br />CONTRACTOR <br /> <br />8.1 FORM TO BE USED <br /> <br />8.1.1 Unless otherwise required in the Bidding Docu- <br />ments. the Agreement for the Work will be written on <br />AlA Document A101, Standard Form of Agreement Be- <br />tween Owner and Contractor, where the basis of payment <br />is a Stipulated Sum. <br /> <br />ARTICLE 9 <br />SUPPLEMENTARY INSTRUCTIONS <br /> <br />1. See Supplementary Conditions for requirements regarding Insurance, Completion <br />Time, Liquidated Damages, Retainage, Performance and Payment Bonds, etc. <br /> <br />2. Each bid must be accompanied by a bid bond or a certified check in the amount <br />of 5% of the Bid. <br /> <br />3. The total price for each bid item shall include all labor, materials, equipment and <br />incidental items and performing all operations necessary to complete the work for <br />each bid item in accordance with the Drawings and Specifications, including any <br />equipment mobilization and demobilization, bonds, excavation, backfill, surface <br />restoration, seeding, installation of gravel base, etc. <br /> <br />4. The Bidder is required to examine carefully the site of the proposed work, the <br />Proposal, Plans and Specifications. He shall satisfy himself as to the character, <br />quality and quantities of work to be performed, materials to be furnished and the <br />requirements of these Specifications. The submission of a Proposal shall be <br />evidence that the Bidder has made such an examination. <br /> <br />5. Contracts-Award-Preference: Contracts for the purchase of goods or services <br />and the construction of works of public improvement shall be awarded to the <br />lowest responsible bidder. <br />