Laserfiche WebLink
<br />1 <br /> <br />1 <br /> <br />4.4.2 Prior to the time and dilte designated for receipt <br />of Bids, any Bid submitted may be modified O( withdrawn <br />by notIce to the party receIving Bids at the place desig- <br />nated for receipt of f3ids. Such notice shall be in writing <br />over the signature of the Bidder or by telegram; if by <br />telegram, written coniirmalion 'over the signature of the <br />Bidder sh,,11 be m"ded and posrmarked on or before the <br />date Jnd lime set for receipt of Bids, and it shall be so <br />worded as not to reveal the amount of the original Bid. <br />4.4.3 Withdrawn Bids may be resubmilted up 10 the time <br />designJled for the receipt of Bids provided that they are <br />then fully in conformance with these Instructions to <br />Bidders. <br />4.4.4 Bid security, if any is required, shall be in an <br />amount sufficient for the Bid as modified or resubmitted. <br /> <br />1 <br /> <br />1 <br /> <br />1 <br /> <br />1 <br /> <br />ARTICLE 5 <br /> <br />CONSIDERATION OF BIDS <br /> <br />5.1 OPENING OF BIDS <br /> <br />5.1.1 Unless stated otherwise in the Advertisement or <br />Invitation to Bid, the properly identified Bids received on <br />t,me will be opened publicly and will be read aloud. An <br />abstract of Ihe Base Bids and Alternate Bids, if any, will <br />be made available to Bidders. When il has been stated <br />that Bids will be opened privately, an abstract of the <br />same information may, at the discretion of the Owner, <br />be made ,war/able to the Bidders within .1 reasonable <br />timC'. <br />S.2 REJECTION OF BIDS <br /> <br />5.2.1 The Owner shall have tbe right to reject any or all <br />Bids and to reject J Bid not accompanied by Jny required <br />bid security. or by other d"ta required by the Bidding <br />Documents, or to reject a Bid which is in any way incom- <br />plete or irregular. <br />5.3 ACCEPTANCE Of BID (AWARD) <br /> <br />5.3.1 It is the intent of the Owner to award J Contract <br />to the lowest re~ponslble Bidder provided the Bid has <br />been ~ubmjlteJ in ,lCcordJnce with the requirements of <br />the Bidding Documents Jnd does not exceed the funds <br />available. The Owner shall have the right to waive any <br />informality or irregularity in Jny Bid or Bids received Jnd <br />to accept the Bid or Bids which, in his judgment, is in his <br />own best interests. <br />5.3.2 The Qwner shalf have the right to accept Alter- <br />nates in any order or combinJtion, unless otherwise <br />specliically provided in Article 9, ,md to determine the <br />low Bidder on the bJsis of the sum of the Base Bid and <br />the Alternates accepted. <br /> <br />1 <br /> <br />1 <br /> <br />1 <br /> <br />I <br /> <br />1 <br /> <br />1 <br /> <br />1 <br /> <br />1 <br /> <br />1 <br /> <br />1 <br /> <br />ARTIClE 6 <br /> <br />POST BID INFORMATION <br /> <br />6.1 CONTRACTOR'S QUALIFICATION STATEMENT <br />6.1.1 Bidders to whom a\\',Hd of a Contract is under <br />consIderatIOn shall submit to the Architect, upon request, <br />a properly executed /\IA Document A305, Contractor's <br />Qualification Statement, unless such a Statement has heen <br />preViously required and submitted ,1S J prerequIsite to <br />the issuance of Gidding Documents. <br /> <br />1 <br /> <br />1 <br /> <br />'I <br /> <br />6.2 OWNER'S FINANCIAL CAPABILITY <br /> <br />6.2.1 The Owner shall, at tbe request of the Gidder to <br />whom award of J Contract is under consideration ,lnd no <br />later than seven days prior to the expiration of the time <br />for withdrawal of Bids, furnish to the Bidder reasonable <br />evidence that the Owner has mJde financial arrangements <br />to fulfill the Conlract obligations. Unless such reasonable <br />evidence is furnished, the Bidder will not be required to <br />execute the Owner-Contractor Agreement. <br /> <br /> <br />6.3 SUBMITTALS <br /> <br />6.3.1 The Bidder shall, within seven days of notificalion <br />of selection for tbe award of a Conlract for the Work, <br />submit the following information to the Architect: <br />.1 a designation of the Work to be performed by the <br />Bidder with his own forces; <br />.2 the proprietary names and the suppliers of princi- <br />pal items or systems of materials and equipment <br />proposed for Ibe Work; <br />.3 a list of names of the Subcontractors or other per- <br />sons or entities (including those who are to furnish <br />materials or equipment fabricated to a special de- <br />sign) proposed for tbe principal portions of the <br />Work. <br />6.3.2 The Bidder will be required to establisb to the sat- <br />isfaction of the Architect and the Owner the reliability <br />and responsibility of the persons or entities proposed to <br />furnish and perform the Work described in the Bidding <br />Documents. <br />6.3.3 Prior to the award of the Contract, Ihe Arcbitect <br />will notify the Bidder in writingif either the Owner or the <br />Architect. after due investigation, has reasonable objec- <br />tion to any such proposed person or entity. If the Owner <br />or Architect has reasonable objection to any such pro- <br />posed person or entity, the Bidder may, at his option, <br />(1) withdraw his Bid, or (2) submit an acceptable substi- <br />tute person or entity with an adjustment in his bid price <br />to cover the difference in cost occasioned by such substi- <br />tution. The Owner may, at his discretion, accept the ad- <br />justed bid price or he may disqualify the Bidder. In the <br />event of either withdrawal or disqualification under this <br />Subparagraph, bid securily will not be forfeited, notwilh- <br />standing the provisions of Paragraph 4.4.1. <br />6.3.4 Persons and entities proposed by the Gidder and 10 <br />whom the Owner Jnd the Architect have made no reason- <br />able objection under the provisions of Subparagraph 6.3.3 <br />must be used on the Work for which they were proposed <br />and shall not be cbanged except wilh the Written consent <br />of the Owner and tbe Architect. <br /> <br />ARTIClE 7 <br />PERFORMANCE BOND AND lABOR AND <br />MATERIAL PAYMENT BOND <br /> <br />7.1 BOND REQUIREMENTS <br /> <br />7.1.1 Prior to execution of the Contract, if required in <br />Article 9 hereinafter, the Bidder shall furnish bonds cover- <br />ing the faithful performance of the Contract and the <br />payment of all obligations arising thereunder in such form <br />and amount as the Owner may prescribe. Bonds may be <br />secured through the Bidder's usual sources. If the furnish- <br /> <br />AlA DOCUMENT A701 . ''''S~RL'CTI()~'i ;0 Ill[)DU,S . TfII"O lOITlO~ . ,lI.iAY 19;"8 . AIA@ . @1'178 <br />THl :\,\1[1\lC.A,~ I~STflUl[ OF \"CIlIT[GS, 1735 ,"'EW YORK ..\VE., ,",W" \VA5f-;I.....GTQ:-..:, D, c. ~OOO6 <br /> <br />A701-1978 4 <br />