Laserfiche WebLink
<br />15. Location and (if known) elevations of all existing <br />and proposed utilities affected by or affecting the <br />drainage design. <br />16. Routing ()f off-site drainage, flow through the <br />deve lopme,nt. <br />17. Definition of flow path leavin<;J the development <br />through the downstream propert;ies ending at a major <br />drainageway. <br />18. Legend to define map symbols. <br />19. Title block in lower right corner. <br /> <br />2. .. Final Drainage Repclrt <br /> <br />The purpose of the Final Drainage Report is to update the concepts <br />and present the design details for the draina.ge facilities <br />discussed in the Preliminary or Conceptual Drainclge Reports. Also, <br />any changes to the Preliminary Drainage conc:ept must be presented <br />and supported with the same level of inforlllat;ion as originally <br />required in the Preliminary Drainage Report. <br /> <br />The Final Drainage Report, which shall accompany the Final <br />Subdivision submittal or the final PlannE~d Unit Development <br />(P.U.D.) submittal, must address comments made during the review of <br />the Preliminary or Conceptual submittals. The IPinal Drainage Report <br />shall be prepared in accordance with the out;line for the <br />Preliminary Drainage Report (Section 2.3.1); the Final Drainage <br />Report drawings and plans shall fulfill the requirements for the <br />contents of the Preliminary plans (Section 2.3.2). See Section 12 <br />of these criteria for t.he Final Stormwater Quality Control Plan <br />submittal requirements, and Section 13 for the Final Erosion <br />Control Plan submittal requirements. Two (2) c:opies of the Final <br />Drainage Report shall be submitted to the cit:y. <br /> <br />In addition to the report <br />presented in Section 2.1, the <br />a page with the following <br />appropriate signature: <br /> <br />format and submittal requirements <br />Final Drainage RE!port shall include <br />certification l.anguage, and the <br /> <br />(Name of DeVeloper/Owner) hereby cert.ifies that the <br />drainage facilities for (Name of prodilS<t.) shall be <br />constructed according to the design presented in this <br />report. I understand that the city of Groeley does not <br />and will not assume liability for drai.nalge facilities <br />designed and/or certified by my enginE!er. I also <br />understand that the city of Greeley relies on the <br />representations of others to establish that drainage <br />facilities are desligned and constructed in compliance <br />with City guidelines, standards, or specifications. <br />Review by the city of Greeley can therefore in no way <br />limit or diminish any liability which I or any other <br />party may have with respect to the design c,r construction <br />of such facilities. <br /> <br />Attest: <br /> <br />(Name of Responsible Party) <br /> <br />2 - 10 <br /> <br />I ' <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />