Laserfiche WebLink
<br />II <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />,I <br />I <br />'I <br />I <br />I <br />I <br />I <br />I <br /> <br />property (i.e., development, irrigation ditches, existing <br />detention facilities, culverts, storm sewers) along the <br />entire path of drainage. Basins and divides are to be <br />identified and topographic contours are to be included. <br /> <br />b) <br /> <br />Floodplain Information: The location of any defined <br />floodplains on the property shall be shown. <br /> <br />Drainage Plan: Map(s) of the proposed development at a <br />scale of 1" = 20' to 1" = 200' on a 24" x 36" drawing <br />shall be included. The plan shall show the following: <br /> <br />c) <br /> <br />1. Existing and (if available) proposed topographic <br />contours at a 2-foot maximum interval. The <br />contours shall extend a minimum of 100 feet beyond <br />the property lines. <br />2. Property lines and easements with purposes noted. <br />3. streets, indicating ROW width, flowline width, curb <br />type, sidewalk, and approximate street slopes. <br />4. Existing drainage facilities and structures, <br />including irrigation ditches, roadside ditches, <br />crosspans, drainageways, gutter flow directions, <br />and culverts. All pertinent information such as <br />material, size, shape, slope, and location shall <br />also be noted. <br />5. Location and type of pertinent major drainage <br />facilities identified in the Comprehensive Drainage <br />Plan relevant to the proposed development. <br />6. Locations of other utilities. <br />7. Overall drainage area boundary and drainage sub- <br />area boundaries. <br />8. Proposed type of street flow (i. e., vertical or <br />combination curb and gutter), roadside ditch, <br />gutter, slope and flow directions, and cross pans. <br />9. Proposed storm sewers and open drainageways, <br />including inlets, manholes, culverts, and other <br />appurtenances, including riprap protection. <br />10. Proposed outfall point for runoff from the <br />developed area and facilities to convey flows to <br />the final outfall point without damage to <br />downstream properties. <br />11. Routing and accumulation of flows at various <br />critical points for the initial storm runoff listed <br />on the drawing using the format shown in Table 2-1. <br />12. Routing and accumulation of flows at various <br />critical points for the major storm runoff listed <br />on the drawing using the format shown in Table 2-1. <br />13. Volumes and release rates for detention storage <br />facilities and information on outlet works. <br />14. Location and elevations of all existing floodplains <br />affecting the property. <br /> <br />2-9 <br />