Laserfiche WebLink
<br />CPG 1-35 <br /> <br />PART 1 OF THE MULTI-YEAR <br />DEVEWPMENT PLAN <br />FOR CAPABILITY SHORTFALLS <br /> <br />Part 1 of the MYDP for capability shortfalls <br />should be completed for all Capability Assessment <br />questions answered with a squared entry, and for <br />which the local emergency program manager has <br />indicated agreement that the local jurisdiction <br />should undertake a capability development effort. <br />Part 1 should be completed for all capability <br />development efforts to be started before 1990. <br /> <br />Priority. This column is used to indicate the local <br />priority (high, moderate, low) for each capability <br />development effort. Priority is defined as the im- <br />portance placed by the locality on each specific <br />capability development effort and its contribution <br />to increasing overall local emergency management <br />capability. Enter an H, M, or L in the space pro- <br />vided. Do not assign priorities to capability <br />development efforts planned to begin in 1990 or <br />later. <br /> <br />Work Period: Start Year, End Year. These columns <br />are used to indicate the Start Year and End Year <br />for each capability development effort. The Work <br />Period should be the total time interval (including <br />weekends, holidays, etc.) over which each effort will <br />take place. Enter the Start Year (e.g., 1988) and <br />End Year in the spaces provided. For those efforts <br />which will be both started and completed within <br />one year, enter the same year in both columns. For <br />those efforts which will be started before 1990, but <br />which may extend into 1990 or beyond, enter a <br />zero (0) in the End Year column and continue with <br />the rest of Part 1. If a capability development ef- <br />fort is planned to begin in 1990 or beyond, enter <br />zeros in the Start Year and End Year columns and <br />do not complete the remaining portion of the <br />MYDP. <br /> <br />Total Resource Estimates: Staff Days, Costs. These <br />columns are used to estimate the total resources (in <br />staff days and dollars) required to complete each <br /> <br />11-8 <br /> <br />January/198 <br /> <br />capability development effort. Estimates for Part 1 <br />should not be constrained by current availability of <br />staff time and funds. <br />For the Staff Days estimate, enter the number of <br />days which will be used for each effort. Include all <br />staff time from full-time or part-time emergency <br />management personnel (existing or new), other <br />local staff (e.g., police, fire, public works), and <br />volunteers. <br />For the Costs estimate, enter the total dollar <br />costs for equipment, materials, supplies, and <br />facilities required for this effort. Do not include <br />staff costs. Examples of items in this category are <br />described below: <br /> <br />Equipment Costs - include purchase prices, pro- <br />curement costs, and engineering costs (if any) to <br />acquire such items as office equipment, computers, <br />vehicles for routine use, communications equip- <br />ment, sirens, radiation counters, emergency <br />generators, and nondisposable protective clothing. <br /> <br />Materials and Supplies Costs - include con- <br />sumable items required for this effort, such as of- <br />fice supplies, postage, printing costs, battery packs, <br />equipment replacement parts, mm badges, gloves, , <br />gas mask mters, disposable clothing, as-well as <br />food, water, fuel, and medical supplies for local <br />emergency facilities. <br />Facilities Costs - include costs for engineering, <br />design. procurement, construction, and installation <br />of physical facilities, and lease/rental costs for <br />space which is used to house and support the local <br />emergency management organization and equip- <br />ment. Examples of local emergency management <br />facilities are the direction and control facili- <br />ty/emergency operating center, communications <br />towers and equipment buildings, and shelter <br />facilities. <br /> <br />Costs are to be entered in current dollars <br />(estimated costs at this time). Effects of inflation <br />should not be included. Dollar amounts should be <br />approximate (e.g., an estimated cost of $5,678 can <br />be entered as $5,7(0). Do not report cents. <br />