My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BOARD02587
CWCB
>
Board Meetings
>
Backfile
>
2001-3000
>
BOARD02587
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/16/2009 3:17:12 PM
Creation date
10/4/2006 7:17:29 AM
Metadata
Fields
Template:
Board Meetings
Board Meeting Date
11/16/2004
Description
CF Section - New Loans - Beaver Reservoir Company - Beaver Reservoir Liner Protection and Valve Replacement Project
Board Meetings - Doc Type
Memo
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />/' <br /> <br />.) <br /> <br />. <br /> <br />. <br /> <br />. <br /> <br />Beaver Creek Reservoir Company <br /> <br />Agenda Item 14a <br /> <br />November 9 2004 <br />Page3of4 ' <br /> <br />solution was cost efficient and would allows the work to be performed when the reservoir is empty <br />and completed before the winter weather hampers construction, allowing the reservoir to operate, <br />uninterrupted, in its intended manner of storing water for release during the irrigation season. <br /> <br />Total Project cost estimate is: <br /> <br />1. <br />2. <br /> <br />Planning/Permitting/Engineeri ng <br />Construction <br /> <br />$29,800 <br />113,000 <br />$142,800 <br /> <br />TOTAL <br /> <br />The engineering design and construction-related services are provided by Golder Associates, Inc. of <br />Lakewood, Colorado. Construction is expected to begin in the Fall 2005. <br /> <br />Financial Analvsis <br /> <br />Table 1 shows a summary of the financial aspects of the Project for the current loan request. A <br />CWCS Loan of $128,500 would have an annual debt service obligation of $6,750 ($6,140 for annual <br />loan payment and $610 for the 10% reserve funding) for the loan terms of 2.5% for 30-years. The <br />total debt service obligation represents a cost of $4.17 per acre-foot for the Reservoir storage. <br /> <br />Table 1. Financial Summary of Project <br /> <br /> Current Loan <br /> Request <br />Total Proiect Cost $142,800 <br />CWCS Loan 190% of Total Proiect Cost) $128,500 <br />CWCS Annual Loan Payment $6,140 <br />CWCS Loan ObliQation iincludinQ 10% debt reserve fundinQ) $6,750 <br />Annual Assessment for Project Only (based on 1600 shares) $4.22/share <br />Annual Project Cost per acre-foot adjudicated (based on 1620AF) $4.17/ac-ft <br /> <br />Prior CWCS Loan History: <br />. November 1992 CWCS loan contract for $42,000 for feasibility study (0% for 30 years) <br />. October 1995 CWCS loan contract for $373,000 at 3% for 40 years ($343,000 project and <br />$30,000 existing FmHA loan) <br />. May 2000 CWCS loan contract amendment consolidating both loans totaling $415,000 (2,733% <br />for 40 years) <br />. November 2004 current balance on this loan is $370,573. This includes the latest loan payment <br />of $17,187 on October 27' 2004. <br /> <br />Combining the current loan request with the previous CWCS loan provides a total loan of $543,500 <br />and an annual loan obligation (including 10% debt reserve funding) of $25,655. This equates to an <br />annual debt service cost of $15.84/acre-foot for this reservoir. <br /> <br />Creditworthiness: The Company is current will all payments to CWCS for the current loan, The <br />Company has no other debt. Repayment of the two loans will be accomplished by increasing share <br />assessments as necessary. <br />
The URL can be used to link to this page
Your browser does not support the video tag.