My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BOARD02587
CWCB
>
Board Meetings
>
Backfile
>
2001-3000
>
BOARD02587
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/16/2009 3:17:12 PM
Creation date
10/4/2006 7:17:29 AM
Metadata
Fields
Template:
Board Meetings
Board Meeting Date
11/16/2004
Description
CF Section - New Loans - Beaver Reservoir Company - Beaver Reservoir Liner Protection and Valve Replacement Project
Board Meetings - Doc Type
Memo
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />'I <br /> <br />\ <br /> <br />Beaver Creek Reservoir Company <br /> <br />Agenda Item 14a <br /> <br />November 9, 2004 <br />Page 4 of 4 <br /> <br />. <br /> <br />Table 2 shows the Financial Ratios for the Company. The Company has adjusted the assessment <br />rates as needed to cover operating and repair costs and therefore, the ratios are shown as strong. <br />Rate history and projections are as follows: 2000 - $16.50/share; 2002 - $21.07/share; 2005- <br />$25.29/share. The price per share was raised in 2001 in anticipation of the Project. The annual <br />operating cost is weak due to the extensive improvements, which have been made in the last 10 <br />years. <br /> <br />Table 2. Financial Ratios <br /> <br />Financial Ratio Without Project With Project <br />Previous Years Future Years <br />Operating Ratio (revenues/expenses) 422% 500% <br />I weak: <100% I-I average: 100% -120% I-Istrong: >120'4 (Strong) (Strong) <br />Debt Service Coverage Ratio 136% 127% <br />(revenues-expenses)/debt service (Strong) (Strong) <br />I weak: <100% 1- I averaoe: 100% - 120% 1- I strono: >120%1 <br />Cash Reserves to Current Expenses 75% 18% <br />I weak:<50% ~ -I average: 50% - 100% I-I strong: >100%1 (Average) (Weak) <br />Annual Operating Cost per Acre-Ft. (1620 AF) $21 $25 <br />!weak: >$20 I-I average: $10 - $20 I-I strong: <$101 (Weak) (Weak) <br /> <br />. <br /> <br />Collateral: As security for this loan the Company will pledge assessment revenues backed by an <br />assessment covenant and a security interest in the Beaver Reservoir and two storage rights totaling <br />1620 acre-feet. This security is in compliance with CWCB Loan Policy #5 (Collateral). <br /> <br />Staff Recommendation <br /> <br />Staff recommends a loan not to exceed $129,785 ($128,500 for project costs and $1,285 for the 1 % <br />Loan Service Fee) to the Beaver Reservoir Company for engineering and construction costs <br />associated with the Beaver Reservoir Liner Protection & Valve Replacement Project, from the <br />Severance Tax Trust Fund Perpetual Base Account. The terms shall be based on the current <br />agricultural rate of 2.5% per annum for a 30-year term. Final approval of the loan shall be <br />conditioned upon all standard contracting provisions of the CWCS Loan Program. Security for the <br />loan shall be collateral in compliance with CWeB Loan Policy #5. <br /> <br />Email copy: <br /> <br />Jim Briscoe, Company SecretaryfTreasurer <br />James Johnson, Golder Associates, Inc. <br />Chad Henderson/Amy Stengel, AGO <br /> <br />Attachment: Water Project Construction Loan Program - Project Data Sheet <br /> <br />. <br />
The URL can be used to link to this page
Your browser does not support the video tag.