My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BOARD02546
CWCB
>
Chatfield Mitigation
>
Board Meetings
>
Backfile
>
2001-3000
>
BOARD02546
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/16/2009 3:16:56 PM
Creation date
10/4/2006 7:17:08 AM
Metadata
Fields
Template:
Board Meetings
Board Meeting Date
1/9/1963
Description
Minutes
Board Meetings - Doc Type
Meeting
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
96
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />1 <br /> <br />since it was a~thorized by the 1958 Flood Con- <br />trol Act. This project, as most of you know, <br />just briefly, is the multiple-purpose reservoir <br />project which will be located on the purgatoire <br />River about fOur miles above the city of Trini- <br />dad. It is designed for flood control, irriga- <br />tion and recreation and includes storages for <br />those purposes. The total storage is about <br />ll4,500 acre-feet. The dam will be approxi- <br />mately 6700 feet long and about 200 feet high <br />above streambed. As I said, we have started <br />and continued our advance planning. We can, <br />I am glad to say, report satisfactory progress <br />at this time. <br /> <br />1 <br /> <br />There have been a number of problems in <br />connection with this project; these problems, <br />however, have not caused us to delay in any <br />way whatsoever the advance planning for con- <br />struction. We have been cooperating closely <br />with the Bureau of Reclamation, the state Water <br />Board, Fish and wildlife Service, both state <br />and federal, and local interests, in bringing <br />this project to conclusion. We hope for a very <br />successful conclusion. We foresee the way <br />things are going now and we believe that we <br />will be in a position to ask for construction <br />start in fiscal year 1964. We hope to get the <br />first element of the job underway, which will <br />be the outlet works, in March, 1964, and have <br />the job completed by 1968. This, of course, <br />assumes that the funds will be made available <br />for a new construction start in 1964; it <br />assumes that a repayment contract will be <br />negotiated, consummated with the water users; <br />it assumes that the city of Trinidad will fur- <br />nish a cash contribution of about 4~ percent <br />of the costs allocated to flood control; and I <br />believe those will be all the items that con- <br />struction will be contingent upon. <br /> <br />We are advancing, as I say. Everything <br />is coming along very well. The operating <br />principles which were mentioned in a previous <br />report, I believe, are being worked out. I <br />know that a lot of effort is being given to <br />
The URL can be used to link to this page
Your browser does not support the video tag.