Laserfiche WebLink
<br />MR. SLOAN: <br /> <br />MR. STAPLETON: <br /> <br />MR. KNIGHTS: <br /> <br />MR. STAPLETON: <br /> <br />MR. REDMOND: <br /> <br />will have some time for thought and we will <br />subsequently call the Steering Committee back <br />together within a month after that, we'll say, <br />to make a decision upon this site selection." <br /> <br />"That answers my question." <br /> <br />1 <br /> <br />"Any other questions? Thank you very <br />much, Jim." <br /> <br />"Thank you, Ben." <br /> <br />"Today to report are two districts of the <br />Corps of Engineers and I'd like to first call <br />on Mr. Redmond of the Albuquerque District to <br />make a report. Mr. Redmond." <br /> <br />"Mr. Chairman, members of the Board, guests, <br />I am James L. Redmond of the Albuqerque Dis- <br />trict Corps of Engineers. We have offices at <br />Albuquerque, New Mexico. We have a portion of <br />Colorado included in our district. It involves <br />the Rio Grande Basin and the Arkansas River <br />Basin in Colorado. I appreciate the opportunity <br />to appear before the Board and to discuss <br />briefly the status of our work in Colorado. I <br />might say that at the present time we have no <br />projects under construction in Colorado. We <br />hope to have some, at least one, in the near <br />future. We do have a number of studies in <br />progress at this time. We are not making any <br />investigations at the present time in the Rio <br />Grande Basin in Colorado. We have participated <br />in numerous studies with the Bureau of Reclama- <br />tion in the past in connection with the Wagon <br />Wheel Gap Reservoir and some local protection <br />and emergency projects on the Rio Grande in <br />Colorado. We have no outstanding authorizations <br />at the present time for further study of the <br />Rio Grande in Colorado. <br /> <br />1 <br /> <br />In connection with the Arkansas River <br />Basin we have no projects, as I have said, under <br />construction; however, we do have an authorized <br />project and we have been doing advance planning <br />on this project for the last two or three years <br />