<br />Pinon Mesa Ranches Community Association - Rural Raw Water Svstem Construction
<br />
<br />Authorization: SB 97-008
<br />Water Source: Florida River
<br />Terms of Loan: $258,000 @ 3,75% for 30 yrs
<br />
<br />County: La Plata - W ofIgnacio
<br />Project Yield: 125 ac,ft,
<br />Project Type: Diversion and Dist. System
<br />
<br />This $345,000 project is the construction of a new rural raw water irrigation and distribution
<br />system in La Plata County west of Ignacio, The project consists of construction of a concrete
<br />diversion structure and pump station at the Florida River, a transmission pipeline from the diversion
<br />to a storage impoundment, and construction of approximately 9,000 feet of distribution pipeline
<br />from the storage impoundment to the water users, RMI Environmental Services of Fannington,
<br />New Mexico prepared the project design. Project construction commenced September 2, 1997 by
<br />RMI Environmental Services of Farmington, New Mexico (a designlbuild contractor), The project
<br />is currently 70% complete and continues to be on indefmite hold due to and financial problems,
<br />
<br />Julesburg Irrigation District - Harmonv Ditch # I Diversion Structure Rehabilitation
<br />
<br />Authorization: Emerg, Infrastructure Repair Account County: Logan - SW of Crook
<br />Water Source: South Platte River Project Yield: 40,000 ac,ft,
<br />Terms of Loan: $590,000 @ 3,75% for 30 years Project Type: Diversion Rehabilitation
<br />
<br />This project is the emergency rehabilitation of the Julesburg Irrigation District's Harmony
<br />Ditch # I diversion structure on the South Platte River 4 miles southwest of Crook, The structure
<br />was damaged by the 1997 South Platte floods and is critical to the operation of the Company's
<br />Julesburg Reservoir. Zoyiopoulos & Associates of Greeley prepared the design plans and the
<br />construction contract was awarded to Concrete Specialties, Inc, of Sterling in early January 1999,
<br />Construction is currently 60% complete, Due to the threat oflow spring runoff, the District decided
<br />to complete 50% of the diversion dam and 100% of the headgate structure, demobilize the
<br />contractor, and complete the project in the fall. Project completion is therefore scheduled for
<br />October 1999,
<br />
<br />Fort Morgan. City of - NCWCD Southern PiDeline Extension
<br />
<br />Authorization: SB94-029, SB98-1189, Svrnce Tax
<br />Water Source: Colo.-Big ThompsonlWindy Gap
<br />Terms of Loan: $5,500,000 @ 4% for 40 years
<br />$8,000,000 @ 4% for 30 years
<br />
<br />County: Weld/Morgan- W ofFt. Morgan
<br />Project Yield: 6,877 ac,ft,
<br />Project Type: Pipeline Construction
<br />
<br />This project is an extension of the Northern Colorado Water Conservancy District's
<br />Southern Pipeline Project. The pipeline extension will provide high quality western slope water to
<br />the City of Fort Morgan for their municipal use, Montgomery Watson, Inc, of Denver completed
<br />the project design, from the Hudson!Ft. Lupton extension at Platteville, to the Fort Morgan area, in
<br />June, The construction contract was awarded to BRB Contractors, Inc. of Topeka, Kansas and
<br />construction commenced September I, 1998, Construction is approximately 65% complete with
<br />project completion scheduled for late 1999,