My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BOARD02519
CWCB
>
Board Meetings
>
Backfile
>
2001-3000
>
BOARD02519
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/16/2009 3:16:44 PM
Creation date
10/4/2006 7:16:56 AM
Metadata
Fields
Template:
Board Meetings
Board Meeting Date
5/24/1999
Description
CF Section - Design and Construction Status Report
Board Meetings - Doc Type
Memo
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />c <br /> <br />County: Prowers - E of Lamar <br />Project Yield: 17,560 ac,ft. <br />Project Type: Diversion Structure <br /> <br />, <br />- <br /> <br />Buffalo Mutual Irrigation Companv - Buffalo Mutual Irrigation Diversion Structure Rehabilitation <br /> <br />Authorization: SB 97-008 <br />Water Source: Arkansas River <br />Terms of Loan: $378,750@3,75%for30yrs <br /> <br />This $325,000 project is the re-construction of the Buffalo Mutual Irrigation Company's <br />diversion structure and headgate on the Arkansas River in Prowers County 17 miles east of the City <br />of Lamar. Wright Water Engineers of Denver, Colorado completed project design and preparation <br />of construction contract documents, The construction contract was awarded to TLM Constructors, <br />Inc, of Swink, Colorado and construction commenced September 21, 1998, The project is 99% <br />complete with project documentation and final accounting currently underway, Substantial <br />completion is scheduled for June 1999, <br /> <br />Summit Reservoir and Irrigation Companv - Summit Reservoir and Ditch Svstem Rehab, <br /> <br />Authorization: SB 97-008 <br />Water Source: Lost Canyon Creek <br />Terms of Loan: $200,000 @ 3,75% for 30 years <br /> <br />County: Montezuma - NE of Cortez <br />Project Yield: 4,287 ac,ft, <br />Project Type: Reservoir and Ditch Rehab, <br /> <br />This project is the rehabilitation of the Summit Reservoir Dam outlet works and the tit <br />construction of repairs and improvements to the Summit Reservoir and Irrigation Company's water <br />collection and distribution facilities, The Cortez office of the Natural Resource Conservation <br />Service prepared the construction plans and specifications, Construction commenced in March by <br />Noland, Inc, of Mancos, CO, and is currently 75% complete, Construction is scheduled for <br />completion in June 1999, <br /> <br />Excelsior Irrigating Companv - Excelsior Ditch Rehabilitation <br /> <br />Authorization: SB 97-008 <br />Water Source: Arkansas River <br />Terms of Loan: $230,000 @3,75%for 30 yrs <br /> <br />County: Pueblo - E of Pueblo <br />Project Yield: 4,250 ac,ft, <br />Project Type: Ditch Rehabilitation <br /> <br />This $335,000 project is the re-construction of approximately 2 miles of open ditch, which <br />has previously been abandoned and farmed over, Also included in the project is the construction of <br />several pump stations for water delivery, The project is located in Pueblo County 10 miles east of <br />Pueblo. Project design was prepared by the Pueblo Office of the Natural Resource Conservation a <br />Service, Ralph Adkins, P,E, of Pueblo, Irrigation Engineering of Alamosa and Hendrooke _ <br />Sprinklers of Ft. Collins, Project construction commenced by the owner and several sub- <br />contractors in May 1998 with project completion scheduled for July 1999, <br />
The URL can be used to link to this page
Your browser does not support the video tag.