Laserfiche WebLink
<br />, <br /> <br />, <br />e <br /> <br />e <br /> <br />e <br /> <br />Proiects Under Construction <br /> <br />Greelev and Loveland Irrigation Companv - EQualizer Dam Rehabilitation <br /> <br />Authorization: SB 98-1189 <br />Water Source: Big Thompson River <br />Terms of Loan: $308,000@4,21%for30years <br /> <br />County: Larimer - E of Loveland <br />Project Yield: 885 ac,ft, <br />Project Type: Dam Rehabilitation <br /> <br />This project is the rehabilitation of the Greeley & Loveland Irrigation Company's Equalizer <br />Reservoir located east of Loveland, The project includes replacement of the dam outlet gate with a <br />new structure, which will incorporate both the outlet gate and a spillway, The existing dam <br />embankment will also be raised almost four feet. ECI Consultants, Inc, of Englewood prepared the <br />construction plans and specifications with the construction contract awarded to Sclunuesor and <br />Associates, Inc, of Wheatridge, CO, Construction commenced on November 16, 1998 and was <br />completed in early March 1999, Project documentation and [mal accounting is currently underway <br />with substantial completion scheduled for May 1999, <br /> <br />Wamslev Cattle Companv - Pole Mountain Dam <br /> <br />Authorization: HB 93-1273 <br />Water Source: Off-Stream Drainage <br />Terms of Loan: $45,000 @ 3% for 40 years <br /> <br />County: Jackson- SW of Walden <br />Project Yield: 1,905 ac,ft, <br />Project Type: Dam Rehabilitation <br /> <br />This dam rehabilitation project commenced in March 1994 by the owners of the Wamsley <br />Cattle Company, The project consists of replacing the reservoir's outlet structure and improving the <br />dam's upstream slope, The work is 99% complete with the [mal inspection by the State Engineer's <br />office recently completed, A punch list of several items needs to be completed before the State <br />Engineer will approve the reservoir's filling plan, Substantial completion is scheduled for June <br />1999, <br /> <br />Johnstown. Town of - Raw Water Pioeline <br /> <br />Authorization: SB 94-29 <br />Water Source: Big Thompson River <br />Terms of Loan: $2,500,000 @ 4% for 30 years <br /> <br />County: LarimerlWeld - W of Johnstown <br />Project Yield: 2,200 ac,ft, <br />Project Type: Pipeline Construction <br /> <br />The project includes the replacement of 11 miles of open ditch with a 14-16 inch pipeline <br />from Lonetree Reservoir to the Town of Johnstown's water treatment plant including a booster <br />station at the reservoir and connection facilities at the treatment plant. PRC Environmental <br />Management, Inc, of Denver designed the project. The construction contract was awarded to Hall- <br />Irwin Construction Co, of Greeley and B,T, Construction, Inc, of Broomfield August 6, 1996, <br />Construction commenced in early October 1996 and was completed in June 1997, Project <br />documentation and final accounting is currently underway with substantial completion scheduled in <br />June 1999. <br />