<br />to be filled from the Upper Platte and Beaver Canal under the Company's 1972 <br />augmentation decree. Brent Nation, Nation Engineering Services, Fort Morgan, Colorado, <br />is the project engineer. The project commenced construction in the fall of 2003 and is 95 % <br />complete. Project completion is scheduled for September of 2005. <br /> <br />4. Stromberger Land and Cattle Company LLC - Augmentation Recharge <br /> <br />Authorization: $414,000 <br />Water Source: South Platte Basin <br />Terms of Loan: $414,000 @2.50% for 20-years <br /> <br />County: Logan <br />Project Yield: 5,000 acre-feet <br />Project Type: Well Augmentation <br /> <br />The Stromberger Land and Cattle Company operates a family ranch located 15 miles <br />south of Sterling, Colorado. The ranch currently operates 12 wells that are augmented <br />under the Groundwater Appropriators of the South Platte (GASP). GASP operates on a <br />year -to-year basis with no guarantee of continued coverage. The current drought <br />conditions have brought to the foreground the difficulty of providing augmentation for <br />well users. The Stromberger's project will provide its own augmentation water to protect <br />itself against possible curtailment by GASP. Construction activities include drilling 6 <br />wells to pump water to a series of constructed recharge ponds have been completed. The <br />Stromberger's were approved for a $59,000 loan increase at the May, 2005 Board <br />Meeting. Project substantial completion is awaiting amendment of the loan contract, <br />which is anticipated to be completed by September of 2005. <br /> <br />5. Grand Mesa Reservoir Company - Rehabilitation of Reservoir No.1 and No.9 <br /> <br />Authorization: Construction Fund <br />Water Source: Gunnison <br />Terms of Loan: $200,000@ 2.4% for 20-years <br /> <br />County: Mesa <br />Project Yield: 1,000 Acre-Feet <br />Project Type: Reservoir Rehabilitation <br /> <br />The Grand Mesa Reservoir Company operates 6 reservoirs on the Grand Mesa to supply <br />water to 16 shareholders for the irrigation of 500 acres. This project involves the <br />replacement of the outlet structures at each reservoir and also addresses seepage problems <br />at each facility. The project was designed by the City of Grand Junction, one of the <br />major shareholders, and is currently being constructed by the City of Grand Junction. <br />The outlet structures have been installed and the seepage problem corrected at both <br />reservoir locations. The City of Grand Junction is draining the two reservoirs to install <br />the new outlet gates. Project is anticipated to be complete after the winter snows melt in <br />June/July of 2005, with substantial completion scheduled for October of 2005 <br /> <br />6. Guenzi Farms. Inc. - Well Augmentation Proiect <br /> <br />Authorization: Severance Tax Fund <br />Water Source: South Platte River <br />Terms of Loan: $331,425 @ 2.5% for 30-years <br /> <br />54 <br /> <br />County: Logan <br />Project Yield: 2,000 acre-feet <br />Project Type: Well Augmentation <br />