My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BOARD02448
CWCB
>
Board Meetings
>
Backfile
>
2001-3000
>
BOARD02448
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/16/2009 3:15:34 PM
Creation date
10/4/2006 7:15:19 AM
Metadata
Fields
Template:
Board Meetings
Board Meeting Date
11/22/1999
Description
CF Section - Non-Reimbursable Projects - El Paso County Water Authority - El Paso County Water Master Plan
Board Meetings - Doc Type
Memo
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />. <br /> <br />RFP NO.: 99-098 <br /> <br />DATE: SEPTEMBER 29,1999 <br /> <br />EL PASO COUNTY <br />PROCUREMENT & CONTRACTS DEPARTMENT <br /> <br />General Specifications <br /> <br />for <br /> <br />PREPARATION OF A COUNTY WATER MASTER PLAN <br /> <br />A. BACKGROUND <br /> <br />The County and the EPCWA are in the process of preparing the CWMP to serve the needs of the <br />current and future inhabitants of EI Paso County. Phase 1A is substantiaily complete, and a copy <br />of the County Water Purveyors Inventory study is included in this RFP as Attachment A. The <br />various phases of the plan are identified below In order of priority: <br /> <br />1. EI Paso County Water Resources <br /> <br />a) Inventory of the County Water Purveyors (substantiaily complete) <br /> <br />. <br /> <br />b) Total Aquifer Resources within the County (Determination of in-situ water supply <br />capabilities of private, county and other government iands. The determination shail <br />be coordinated with the Colorado State Engineers Office.) . <br /> <br />2. Potential Water Imoort Proiects (Evaluation of potential and proposed delivery systems <br />and associated claimed water rights) <br /> <br />3. Ootimum County Water Distribution Infrastructure (This determination is to be based on <br />the consideration of water transport, storage [surface and subsurface], exchange <br />possibilities, needs, treatment requirements, and potential sources of imported water). <br />This study phase shail include Demand Management and Water Conservation, and <br />address interconnection of systems. <br /> <br />4. Water Plan for Private Weil Owners (These private weils are shailow and subject to <br />possible future depletion. The current estimated population served by these types of <br />weils is 25,000 people. The study is to address the most economical phased approach to <br />supply them with a new water source. The determination shall be coordinated with the <br />Colorado State Engineers Office) <br /> <br />5. Water Reuse Proiects (A study of the potential water supply and demands of the County, <br />and water quality requirements for different end uses and their sales/income potentiaL) <br />This study (phase?) shall include Demand Management and Water Conservation. <br /> <br />. <br /> <br />6. Svneraistic Prolects with Colorado Sorinas Utilities (An investigation of joint use projects <br />with the City of Colorado Springs in regard to surface and subsurface water storage, and <br />the conjunctive use of water sources, treatment facilities, supply and distribution <br />systems.) , <br />
The URL can be used to link to this page
Your browser does not support the video tag.