Laserfiche WebLink
<br />. <br /> <br />RFP NO.: 99-098 <br /> <br />DATE: SEPTEMBER 29,1999 <br /> <br />EL PASO COUNTY <br />PROCUREMENT & CONTRACTS DEPARTMENT <br /> <br />General Specifications <br /> <br />for <br /> <br />PREPARATION OF A COUNTY WATER MASTER PLAN <br /> <br />A. BACKGROUND <br /> <br />The County and the EPCWA are in the process of preparing the CWMP to serve the needs of the <br />current and future inhabitants of EI Paso County. Phase 1A is substantiaily complete, and a copy <br />of the County Water Purveyors Inventory study is included in this RFP as Attachment A. The <br />various phases of the plan are identified below In order of priority: <br /> <br />1. EI Paso County Water Resources <br /> <br />a) Inventory of the County Water Purveyors (substantiaily complete) <br /> <br />. <br /> <br />b) Total Aquifer Resources within the County (Determination of in-situ water supply <br />capabilities of private, county and other government iands. The determination shail <br />be coordinated with the Colorado State Engineers Office.) . <br /> <br />2. Potential Water Imoort Proiects (Evaluation of potential and proposed delivery systems <br />and associated claimed water rights) <br /> <br />3. Ootimum County Water Distribution Infrastructure (This determination is to be based on <br />the consideration of water transport, storage [surface and subsurface], exchange <br />possibilities, needs, treatment requirements, and potential sources of imported water). <br />This study phase shail include Demand Management and Water Conservation, and <br />address interconnection of systems. <br /> <br />4. Water Plan for Private Weil Owners (These private weils are shailow and subject to <br />possible future depletion. The current estimated population served by these types of <br />weils is 25,000 people. The study is to address the most economical phased approach to <br />supply them with a new water source. The determination shall be coordinated with the <br />Colorado State Engineers Office) <br /> <br />5. Water Reuse Proiects (A study of the potential water supply and demands of the County, <br />and water quality requirements for different end uses and their sales/income potentiaL) <br />This study (phase?) shall include Demand Management and Water Conservation. <br /> <br />. <br /> <br />6. Svneraistic Prolects with Colorado Sorinas Utilities (An investigation of joint use projects <br />with the City of Colorado Springs in regard to surface and subsurface water storage, and <br />the conjunctive use of water sources, treatment facilities, supply and distribution <br />systems.) , <br />