Laserfiche WebLink
<br />~ <br /> <br />. <br /> <br />. <br /> <br />. <br /> <br />- <br />~ <br /> <br />Recommendation <br /> <br />Staff recommends that the Board recommend to the General Assembly that a grant in <br />the amount of up to $200,000 from the CWCB Construction Fund be made to the El Paso <br />County Water Authority in support of the preparation of a Water Master Plan for El Paso <br />County. The funds shall be appropriated directly to the El Paso County Water Authority on a <br />50% cost sharing basis until the plan is completed. <br /> <br />Attachment: Master Water Plan General Specifications <br /> <br />cc: Peter Evans, Director <br />Dan McAuliffe, Deputy Director <br />Mike Serlet, Chief, CWCB Water Supply Planning and Finance Section <br />Phillip J. Voegtle, El Paso County Water Authority <br /> <br />C:\My Documents\Director Reports\991115g - EI Paso County Proposal <br /> <br />3 <br />