Laserfiche WebLink
<br />Pinon Mesa Ranches Community Association - Rural Raw Water System Construction <br /> <br />- <br /> <br />Authorization: SB 97-008 <br />Water Source: Florida River <br />Terms of Loan: $206,000 @ 3.75% for 30 yrs <br /> <br />County: La Plata <br />Project Yield: 125 ac.ft. <br />Project Type: Diversion and Dist. System <br /> <br />This $275,000 project is the construction of a new rural raw water irrigation and distribution <br />system in La Plata County west of Ignacio. The project consists of construction of a concrete <br />diversion structure and pump station at the Florida River, a transmission pipeline from the diversion <br />to a storage impoundment, and construction of approximately 9,000 feet of distribution pipeline <br />from the storage impoundment to the water users. RMI Environmental Services of Farmington, <br />New Mexico prepared project design. Project construction commenced September 2, 1997 by RMI <br />Environmental Services of Farmington, New Mexico (a design/build contractor). The project is <br />currently 50% complete and has been re-scheduled for a July 1998 completion due to Right-of-Way <br />and Permitting delays. <br /> <br />Wamslev Cattle Companv - Pole Mountain Dam <br /> <br />Authorization: HB 93-1273 <br />Water Source: Off-Stream Drainage <br />Terms of Loan: $45,000 @ 3% for 40 years <br /> <br />County: Jackson <br />Project Yield: 1,905 ac.ft. <br />Project Type: Dam Rehabilitation <br /> <br />e <br /> <br />This darn rehabilitation project commenced in March 1994 by the owners of the Wamsley <br />Cattle Company. The project consists of replacing the reservoir's outlet structure and improving the <br />darn's upstream slope. The remaining work includes placement of the upstream face riprap and <br />installation of the outlet gate. The project has been re- scheduled for completion in 1998. <br /> <br />Durkee Ditch Comoanv - Rehabilitation of the Durkee Ditch <br /> <br />Authorization: SB 97-008 <br />Water Source: Currant Creek <br />Terms of Loan: $120,000 @ 3.75% for 30 yrs <br /> <br />County: Delta <br />Project Yield: 2,000 ac.ft. <br />Project Type: Headgate and Pipeline <br /> <br />This $343,000 project is the construction of a new concrete headgate and turnouts, and <br />construction of approximately 13,000 feet ofPVC pipeline replacing an open channel ditch in Delta <br />County northeast of Delta, Colorado. The Delta and Grand Junction Office of the Natural Resource <br />Conservation Service prepared project design. Project construction commenced September 8, 1997 e <br />by K C Equipment and Consulting of Delta, Colorado. Phase I of the project was completed in <br />December 1997 with the final Phase II scheduled for completion in October 1998. The project is <br />currently 50% complete. <br />