Laserfiche WebLink
<br />; <br /> <br />e <br /> <br />e <br /> <br />e <br /> <br />Decker Lateral Comvanv - Rehabilitation of the Decker Lateral Ditch <br /> <br />Authorization: Small Project Loan Account <br />Water Source: Owl Creek Supply and Irrigation <br />Terms of Loan: $100,000@4.25%for30yrs <br /> <br />County: Weld <br />Project Yield: 4,000 ac.ft. <br />Project Type: Concrete Ditch Lining <br /> <br />This $145,000 project is the concrete lining of approximately 7,900 feet of an existing open <br />channel irrigation ditch in Weld County northeast of Greeley. The Greeley Office of the Natural <br />Resource Conservation Service prepared project design. The construction contract was awarded to <br />Pete D&L Contractors, Inc. of Evans, Colorado November 5, 1997. Project construction <br />commenced November 18, 1997 with project completion scheduled for May 1998. This ditch- <br />lining project is currently 99% complete with final project documentation underway. <br /> <br />Farmers Independent Ditch Comvanv - Rehabilitation of the Farmers Independent Ditch <br /> <br />Authorization: Small Project Loan Account <br />Water Source: South Platte River <br />Terms of Loan: $55,000 @ 3.75% for 30 yrs <br /> <br />County: Weld <br />Project Yield: 15,000 ac.ft. <br />Proj ect Type: Pipeline <br /> <br />This $75,000 project is the re-construction of approximately 1,000 linear feet of 24-inch <br />diameter concrete pipeline replacing an existing open ditch in poor condition. The project is <br />located in Weld County southwest of Platteville. The Greeley Office of the Natural Resource <br />Conservation Service prepared project design. Project construction commenced by Robb's Repair, <br />Inc. of Evans, Colorado November 10,1997 with project completion scheduled for May 1998. The <br />project is currently 99% complete with final project documentation underway. <br /> <br />Town of Morrison - Raw Water Pipeline Rehabilitation <br /> <br />Authorization: SB 95-11 15 <br />Water Source: Bear Creek <br />Terms of Loan: $504,000 @ 5% for 30 yrs <br /> <br />County: Jefferson <br />Project Yield: 625 ac.ft. <br />Project Type: Pipeline/Grit Chamber <br /> <br />This $672,000 project is the construction of a new raw water grit chamber and transmission <br />line replacing a similar functionally obsolete facility in Jefferson County for the Town of Morrison. <br />The project consists of construction of a new concrete grit chamber at the Bear Creek diversion <br />structure and the construction of approximately 900 feet of Ductile Iron and HDPE transmission <br />pipeline along a precarious canyon wall. McLaughlin Water Engineers, Inc. of Denver, CO <br />prepared project design. The project construction contract was awarded to J.R. Walton <br />Construction Co. of Indian Hills, Colorado September 18,1997. Construction commenced October <br />1, 1997, is currently 95% complete and scheduled for substantial completion June 1, 1998. <br />