Laserfiche WebLink
<br />'" <br /> <br />Palisade, TO\'in of - Cottonwood Creek Pipeline Rehabilitation <br /> <br />Authorization: HB 95-1155 <br />Water Source: Cottonwood Creek <br />Terms of Loan: $750,000 @4.0% for 30 years <br /> <br />. <br /> <br />County: Mesa - SE of Palisade <br />Project Yield: 2,210 ac.ft. <br />Project Type: Pipeline Replacement <br /> <br />This project is the 22,000 linear foot replacement of the Town of Palisades Cottonwood <br />Creek pipeline. The proposed pipeline will be a 12-inch diameter ductile iron pipe from the outlet <br />pipe on Cabin Reservoir to an existing pipe 5,300 feet upstream of the Town's water treatment <br />plant. The pipe will be installed along the access road that runs through the narrow rocky canyon of <br />Cottonwood Creek. Del-Mont Consultants, Inc. of Montrose, CO. has completed the design plans <br />with construction scheduled to commence in November 1999. <br /> <br />San Luis Vallev Canal Companv - Diversion Structure Rehabilitation <br /> <br />Authorization: SB 97-008 <br />Water Source: Rio Grande River <br />Terms of Loan: $188,000 @3.75% for 30 years <br /> <br />County: Rio Grande - E of Monte Vista <br />Project Yield: 25,000 ac.ft. <br />Project Type: Diversion Structure Rehab. <br /> <br />This project is the rehabilitation of the San Luis Valley Canal Company's Rio Grande River . <br />diversion structure. The project is located in Rio Grande County, 3 miles east of Monte Vista. The <br />Alamosa office of the Natural Resource Conservation Service has prepared the design plans with <br />the CWCB staff preparing the construction contract documents. Project construction has been re- <br />scheduled to commence in July 2000 and be completed in late 2000. <br /> <br />Riverside Reservoir and Land Companv - Riverside Reservoir Spillwav Rehabilitation <br /> <br />Authorization: SB 98-1189 <br />Water Source: South Platte River <br />Terms of Loan: $450,000 @3.75%for20yrs. <br /> <br />County: Weld - NW of Wiggins <br />Project Yield: 200 ac.ft. <br />Project Type: Spillway Rehabilitation <br /> <br />This project is the construction of an emergency spillway on the Riverside Reservoir Dam, <br />located II miles northwest of Wiggins in Weld County. The State Engineer has placed a storage <br />restriction on the reservoir until an emergency spillway is completed. The Riverside Reservoir and <br />Land Company contracted with W.W. Wheeler and Associates of Denver to prepare construction <br />plans and specifications. The State Engineer's office is currently reviewing the plans with <br />construction scheduled to commence in early 2000 and be completed in late 2000. <br /> <br />. <br />