My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BOARD02336
CWCB
>
Board Meetings
>
Backfile
>
2001-3000
>
BOARD02336
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/16/2009 3:14:41 PM
Creation date
10/4/2006 7:14:05 AM
Metadata
Fields
Template:
Board Meetings
Board Meeting Date
9/27/1999
Description
Directors' Reports
Board Meetings - Doc Type
Memo
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
50
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />DeWeese-Dve Ditch and Reservoir Companv - DeWeese Dve Reservoir Darn Rehabilitation <br /> <br />Authorization: SB 98-1189 <br />Water Source: Grape River <br />Terms of Loan: $734,000 @4% for 30 years <br /> <br />. <br /> <br />County: Custer - SW of Canon City <br />Project Yield: 4,020 adt. <br />Project Type: Darn Rehabilitation <br /> <br />This project consists of the replacement of the entire upper 12 feet of the DeWeese Dye <br />darn crest. The new crest section will include reinforcing bar anchors drilled and grouted into the <br />original darn and a new drainage/seepage control system. GEl Consultants, Inc. of Englewood, CO <br />completed project design and construction contract documents. The construction contract was <br />awarded to Blattner and Sons, Construction Co., Inc. of Avon, Minnesota July 19, 1999. <br />Construction commenced in August with completion scheduled for November 1999. <br /> <br />Leroux Creek Water Users Association - Carl Smith Darn Rehabilitation <br /> <br />Authorization: Emergency Infrastructure Account <br />Water Source: Leroux Creek <br />Terms of Loan: $300,000 @ 4.0% for 30 years <br /> <br />County: Delta - N of Hotchkiss <br />Project Yield: 750 ac.ft. <br />Project Type: Darn Rehabilitation <br /> <br />This emergency loan project is the re-construction of the Carl Smith Darn, located 15 miles . <br />north of Hotchkiss in Delta County, which failed unexpectedly in May 1998. The Leroux Creek <br />Water Users Association contracted Smith Geotechnical Engineering Consultants of Forth Collins <br />to analyze design alternatives and complete construction plans and specifications. Construction <br />commenced by Zak Dirt of Longmont in September and is scheduled for completion in November <br />1999. <br /> <br />Wood Lake Mutual Water & Irrigation Companv - Wood Lake Darn Rehabilitation <br /> <br />Authorization: SB 97-008 <br />Water Source: Cache la Poudre River <br />Terms of Loan: $188,000@3.75%for30years <br /> <br />County: Weld - W of Eaton <br />Project Yield: 3, I 06 ac.ft. <br />Project Type: Darn Rehabilitation <br /> <br />This project is the replacement of the Wood Lake Darn outlet works including all control <br />structures, installation of a toe drain, raising the existing saddle darn, and construction of a spillway <br />to pass the 50% Probable Maximum Precipitation flood. The need for the improvements is a result <br />of the State Engineer's Office darn safety requirements. Smith Geotechnical, Inc. of Fort Collins <br />commenced design in late spring 1998. Construction commenced by Barker Construction <br />Company of Fort Collins in September and is scheduled for completion in late I 999. <br /> <br />. <br />
The URL can be used to link to this page
Your browser does not support the video tag.