My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BOARD02298
CWCB
>
Board Meetings
>
Backfile
>
2001-3000
>
BOARD02298
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/16/2009 3:14:20 PM
Creation date
10/4/2006 7:13:38 AM
Metadata
Fields
Template:
Board Meetings
Board Meeting Date
5/19/1938
Description
Minutes
Board Meetings - Doc Type
Minutes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br /> <br />31 <br /> <br />2. Reservoir Projects in San Luis Valley. <br />including Wgaon Wheel Gap Reservoir on Rio <br />Grande River, $11.000.000; and on tlIe <br />Conej os River. either the Granite Reservoir, <br />$3.655.000, 0;: both the Mogote end Platon. <br />Reservo~rs, combined cost $1,355.000. as selected <br />,by proponents. <br /> <br />3. Reservail" Projects in Eastern Colorado. <br />including Apishapa. Long's Canyon. and Wray, <br />aggregate oost $1,607,000; and including <br />Caddoa Reservoir, looal d~e costs $5.000.000, <br />of whioh. if proposed bill passes. 1001101 interests <br />will pay 30% ar $1.500.000. <br /> <br />4. Investigation Projeots. inoluding Underground <br />Waters and the effeot on existing uses of surface <br />waters in the Rio Grande. Arkansas, Republican, <br />and South Platte Basins in Colorado, where aoute <br />problems are resulting from pumping operations. <br />~ds required $275.000; and inoluding an <br />investigation and report of the proposed Gunnison- <br />Arkansas Transmountain Diversion. with a.1l features <br />necessary far the proteot!. on of p resent and <br />prospeotive uses of water in the Gunnison Basin, <br />funds required $225.000. <br /> <br />BE IT FURTHER RESOLVED, that oopies of this resolution be forwarded <br />to each member of Colorado I s Congressional delegati on; that a meeting be <br />arranged. at the earliest possible date. with Mr. Geo. M. Bull. State PWA. <br />Engineerj ..and that representatives and:prDpanEinj;.s.qf.cthe said.recOlllltlended <br />projects be advised of said meeting and be inviteq.to ,attend." <br /> <br />On motion of Mr. Dille, seoonded by Judge O'ROl11"ke. the foregoing <br />resolution was duly adopted mid by the Chairman deolared passed. <br /> <br />There then followed a discussion of the survey on the proposed <br />Gunnison_Arkansas Diversion. Mr. Stone explained what had been done on <br />this matter'. After suoh disoussion. it was moved by Mr. Dille end seoonded <br />by:Mr. Aspinall that the Board give Mr. Stone a vote 'of cQnfidenoe and <br />approval of his aotions and polioies in respect to the questian of the <br />survey of the proposed Gunnison-Arkansas Transmountain Diversion and <br />support him in the polioy that he has adopted. After <l.isoussion, such <br />motion was unanimously passed and apprOTed. <br /> <br />It was moved by Mr. Bailey and seconded by Mr. Dille that the <br />engineering department of the Board be authorized to prooeed with suoh <br />engineering studies for the l1Iebrallka.;;oWyoming oase as may be oonsidered <br />necessary by the Attorney General and by this Board for proteo-lian of' <br />Colorado's interests. After disoussian. said motion was duly. passed and <br />adopted. <br />
The URL can be used to link to this page
Your browser does not support the video tag.