Laserfiche WebLink
<br />The Board has authorized the following project loans through the Emergency <br />Infrastructure Repair Loan Account. . <br /> Loans Approved by the CWCB from the <br /> Emergency Infrastructure Repair Loan Account <br />Date Approved Contract <br />Approved Borrowet - Emerl!encv County Amount Amount <br />lul 1993 Summit Reservoir and Irrigation Company - Montezwna $ 60,000 $ 33,000 <br /> Repair a slide on the Swnmit Reservoir Dam and <br /> Repair a portion of the Lost Canyon Ditch <br />lan 1994 Windsor Canal and Reservoir Co. , Larimer 300,000 300,000 <br /> Poudre Valley Canal Slide Repairs <br />Feb 1994 Town of Rangely - Rio Blanco 34,000 34,000 <br /> Raw Water Intake Structure Repairs <br />Nov 1994 Castle Pines North Metro District ' Douglas 10 1 ,500 100,500 <br /> Rehabilitate Well A-I <br />Nov 1995 City ofIdaho Springs. Clear Creek 130,000 130,000 <br /> Diversion Structure Repairs <br />Nov 1996 Consolidated Extension Canal Co. . Las Animas 300,000 300,000 <br /> Siphon Rehabilitation <br />Nov 1996 Mancos Water Conservancy Disltict- Montezwna 62,500 62,500 . <br /> Feeder Ditch Slide Repair <br />Sep 1997 lulesburg Irrigation District- Logan 590,000 590,000 <br /> Diversion Structure Rehabilitation <br />lu11998 Leroux Creek Water Users Association - Delta 300,000 300,000 <br /> Carl Smith Reservoir Rehabilitation <br />May 1999 Model Reservoir and Irrigation Co. . Las Animas 335,000 335,000 <br /> Model Reservoir Rehabilitation <br />Nov 1999 Chilcott Ditch Co. - EI Paso 250,000 250,000 <br /> Diversion Structure Rehabilitatioll <br />Sept 2000 Twmel Water Co. - Larimer 1.600.000 1.600.000 <br /> Laramie - Poudre Twmel <br /> Totals $4,063,000 $4,035,000 <br /> <br />The General Assembly, through SB 97-008, added $960,000, and through <br />HB 00-1419, added $1,475,000, from the Construction Fund, thus restoring the balance <br />in the account each time to $2 million. <br /> <br />. <br />