My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BOARD02167
CWCB
>
Board Meetings
>
Backfile
>
2001-3000
>
BOARD02167
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/16/2009 3:13:02 PM
Creation date
10/4/2006 7:12:04 AM
Metadata
Fields
Template:
Board Meetings
Board Meeting Date
9/14/1962
Description
Minutes and Resolution
Board Meetings - Doc Type
Meeting
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
82
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />I <br /> <br />money is obtained. The cities of Aurora and <br />Colorado springs retained Bechtol Corporation <br />as a consultant for their work on the Home- <br />stake Project. We have had some initial <br />meetings with their consultant, Bechtol, to <br />see how the Homestake Project might effect <br />the Fryingpan-Arkansas Project, if it does <br />at all. <br /> <br />We are studying a unit on the Cache la <br />poudre River to better utilize the water <br />there. This is in the reconnaissance stage. <br />Our reconnaissance studies are completed and <br />the report is being reproduced. These studies <br />show that we would be justified in going on <br />into a feasibility study of the Cache la <br />poudre unit. This unit develops the remain- <br />ing flood waters that have been, at times, <br />going to waste down the river. We hope to <br />make better utilization of water and to save <br />water. Some of the functions on this project <br />will be irrigation water, municipal water, <br />power, recreation, and fish and wildlife <br />functions. Flood control was tried but there <br />are not enough benefits there to do much for <br />flood control. <br /> <br />We are also studying an afterbay below <br />Green Mountain Dam and Powerplant. This work <br />was started the 3rd of July. We are just <br />barely getting into it. The hydrology is a <br />bit difficult. It is going to take some time. <br />We have selected two dam sites to study to <br />see which might better fit into the plan and <br />an appraisal report is supposed to be done on <br />this about November. We don't know whether <br />we'll go on into a feasibility study yet or <br />not. <br /> <br />I <br /> <br />On the South Platte Basin, the Board <br />members have the written report here which <br />has a lot of details in it. I think I'll not <br />try to go into all of them with the time limit <br />but I think the most important thing here is <br />the paragraph about the middle of your page 3. <br />We were supposed to make a decision on a <br />
The URL can be used to link to this page
Your browser does not support the video tag.