My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BOARD02143
CWCB
>
Board Meetings
>
Backfile
>
2001-3000
>
BOARD02143
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/16/2009 3:12:49 PM
Creation date
10/4/2006 7:11:40 AM
Metadata
Fields
Template:
Board Meetings
Board Meeting Date
3/8/1967
Description
Agenda or Table of Contents, Minutes, Memos
Board Meetings - Doc Type
Meeting
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
101
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />:J6o%.:J.:J <br /> <br />I.. <br />".' . <br />'. <br /> <br />some reconnaissance evaluations of several <br />different types of power potential which <br />might be developed from the project. We <br />should get those any time and at that time <br />we will start our feasibility investigations <br />of whatever the Chief considers to be the <br />most desirable of those potentials that were <br />offered him for consideration. <br /> <br />On our st. Vrain Unit, Missouri River <br />Basin project, we are in the process of com- <br />piling and organizing the data and writing <br />the report proper on the unit. We have had <br />inquiries and several meetings in the last <br />few months with representatives of several <br />of the towns in the st. Vrain Basin to dis- <br />cuss their needs and their requirements and <br />some of the potentials that we have looked <br />at in the st. Vrain study and which will be <br />in the report. <br /> <br />As far as the Fryingpan-Arkansas proj- <br />ect, these will be figures that will be more <br />recent, actually we just got them as of yes- <br />terday, than those in our written report. <br />The contractor for Ruedi Dam has now completed <br />59.7 percent of the contract with 72.8 per- <br />cent of the contract time elapsed. Spillway <br />excavation continued with excavated materials <br />being moved into stockpile. Concrete place- <br />ments were continued in the outlet works. <br />Drilling and installation of rock bolts were <br />suspended in November for the duration of <br />the winter. Drilling and grouting opera- <br />tions continued throughout the report period. <br /> <br />1 <br /> <br />The contractor for the Divide, South <br />Fork, and Chapman Tunnels, Diversion Dams, <br />and appurtenant structures of the South <br />Side Collection system had completed 49.1 <br />percent of the contract with 49.5 percent of <br />the contract time elapsed. Excavation of the <br />tunnels had progressed as follows: Divide, <br />13,761 feet; South Fork, 10,485 feet: Chap- <br />man, 13,875 feet. Bad weather halted <br />
The URL can be used to link to this page
Your browser does not support the video tag.