My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BOARD02143
CWCB
>
Board Meetings
>
Backfile
>
2001-3000
>
BOARD02143
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/16/2009 3:12:49 PM
Creation date
10/4/2006 7:11:40 AM
Metadata
Fields
Template:
Board Meetings
Board Meeting Date
3/8/1967
Description
Agenda or Table of Contents, Minutes, Memos
Board Meetings - Doc Type
Meeting
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
101
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />5434 <br /> <br />concreting operations on diversion structures. <br />The Divide Tunnel access road was completed. <br />Some excavation work was done in the Divide <br />Tunnel inlet portal and South Fork Tunnel <br />outlet portal areas, but was suspended be- <br />cause of poor weather conditions. <br /> <br />I <br /> <br />The contractor for Sugar Loaf Dam and <br />roads had completed 46 percent of the con- <br />tract with 37.2 percent of the contract time <br />elapsed. First-stage concreting operations <br />for the outlet works are essentially finished. <br />All other concreting operations, except form <br />building, have been suspended until the ad- <br />vent of more favorable weather. <br /> <br />The contractor on the major portion of <br />the County Road No. 104 relocation and im- <br />provement had completed 92.2 percent of the <br />contract with 59.4 percent of the contract <br />time elapsed. Road construction operations <br />were suspended on December 5, 1966. The <br />contractor on the Fryingpan River bridge <br />completed setting prestressed concrete beams, <br />then suspended operations for the winter. <br /> <br />The contractor for clearing and fencing <br />at Ruedi Reservoir had completed 61 percent <br />of the contract with 41.3 percent of the con- <br />tract time elapsed. Clearing continued inter- <br />mittently during the report period, but ~n <br />February 4th, the contractor suspended opera- <br />tions until the weather improves. <br /> <br />On the Upper Colorado River storage <br />project, the contractor for construction of <br />the poncha-Midway section of the Curecanti- <br />Midway 230-kv. transmission line had com- <br />pleted 80.4 percent of the contract with 50 I <br />percent of the contract time elapsed. De- <br />livery of tower steel was about 85 percent <br />complete, clearing was about 80 percent com- <br />plete, and tower steel erection was about <br />45 percent complete. <br />