Laserfiche WebLink
<br />.J~~,G <br /> <br />On our Narrows Unit, since our last <br />meeting we have sent the report to the com- <br />missioner revised to reflect the comment of <br />our previous draft by the state and all of <br />our field offices of our federal agencies. <br />That report is now in our Commissioner's <br />office and he is in the process of preparing <br />his report to go to the secretary of the <br />Interior and to the various federal agencies. <br />We hope to get that report out of the Com- <br />missioner's office within the next few days. <br /> <br />I <br /> <br />Information on the proposed operation <br />of the Narrows Unit was presented to the Colo- <br />rado Water Pollution Control commission at a <br />meeting on February 8, 1967. <br /> <br />with regard to the upper South Platte <br />unit, Missouri River Basin Project, the origi- <br />nal plan of preparing a report on the ~~o <br />Forks Dam and Reservoir followed by another <br />report on the remaining features of the Upper <br />South platte Unit has been revised. Instead, <br />one report covering all proposed features of <br />the unit, including power generating facili- <br />ties, will be prepared. <br /> <br />Studies showing the effects of Two Forks <br />Reservoir on the volume of flow in the South <br />platte River at the Denver sewer outfall were <br />completed. Rock testing by the Office of <br />the Chief Engineer continued. <br /> <br />We had essentially completed the esti- <br />mates of our road relocations which are <br />required in connection with the Two Forks <br />Dam and Reservoir and they are very signifi- <br />cant. We met with all of the agencies, in- I <br />eluding federal, local and state that are <br />concerned with those relocations and have <br />obtained tentative agreement with them on <br />the criteria used. We have our estimates <br />essentially completed for that. We are in <br />the process now of completing some of our <br />hydrologic studies. We have also recently <br />asked our Chief Engineer to prepare for us <br />