My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BOARD02143
CWCB
>
Board Meetings
>
Backfile
>
2001-3000
>
BOARD02143
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/16/2009 3:12:49 PM
Creation date
10/4/2006 7:11:40 AM
Metadata
Fields
Template:
Board Meetings
Board Meeting Date
3/8/1967
Description
Agenda or Table of Contents, Minutes, Memos
Board Meetings - Doc Type
Meeting
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
101
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />I <br /> <br />had become greatly weakened by cracking and <br />was in need of steel sets through most of <br />its length. During the construction season <br />some difficulty was experienced with slight <br />vertical settling of the sets, but this was <br />corrected when the first invert was installed. <br />The contract is now about 65 percent completed. <br />The tunnel will be ready for water delivery <br />this spring. <br /> <br />AS an item of interest, the Central Utah <br />project has been started. It is one of the <br />participating projects, the principal project <br />for the state of Utah. Bids were opened on <br />February 16th for construction of the 2,920- <br />foot-long, 150-foot-high starvation Dam near <br />Duchesne, utah. An apparent low bid of <br />$8,182,750 was received. Award of the con- <br />tract is pending. Bids were also opened <br />during February for the Knight Diversion <br />Dam on the Duchesne River and for the Starva- <br />tion Feeder Conduit which will convey water <br />from the Knight Diversion Dam over to Starva- <br />tion Reservoir. The starvation Feeder Conduit <br />is approxi~ately one mile long and will con- <br />sist of a concrete-lined tunnel about 7 feet <br />in diameter. Total construction cost of the <br />Starvation complex is estimated t~ be about <br />$20 million. <br /> <br />I <br /> <br />Moving on to the CRSP Transmission sys- <br />tem, this system is nearing completion as <br />presently planned. Mr. Droskin reported to <br />you on the progress on the poncha-Midway sec- <br />tion of this line. The 230-kv lines from <br />Cheyenne to Glen canyon and the two 345-kv <br />lines from Glen Canyon to Phoenix are in oper- <br />ation. The Curecanti-poncha section of the <br />Curecanti-Midway 230-kv line is completed and <br />excellent progress is being made on the Poncha- <br />Midway section. The Rifle Substation, roads, <br />and other final items remain. The Flagstaff <br />Substation has been completed and only final <br />checkout work remains. <br />
The URL can be used to link to this page
Your browser does not support the video tag.