My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BOARD02138
CWCB
>
Board Meetings
>
Backfile
>
2001-3000
>
BOARD02138
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/16/2009 3:12:44 PM
Creation date
10/4/2006 7:11:34 AM
Metadata
Fields
Template:
Board Meetings
Board Meeting Date
9/11/1963
Description
Minutes
Board Meetings - Doc Type
Meeting
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
93
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />..J..JV..J <br /> <br />I <br /> <br />In the Denver Development Office, the Upper <br />South Platte Basin area, the Bureau of Reclama- <br />tion commenced reconnaissance surveys of the <br />South Platte Basin above Narrows on the 1st of <br />July. This was initiated with money furnished <br />by the State of Colorado, carried over from fiscal <br />1963. As you know, the principal features under <br />study are Two Forks Reservoir, storage space be- <br />low the Two Forks Reservoir and appraisal of <br />potential water developments of the related area. <br /> <br />We have geologic data for five axes for the <br />Two Forks Dam site and this has been reviewed, <br />some additional geologic studies made and a <br />summary report prepared. <br /> <br />We have held one meeting with representatives <br />of Aurora and Denver and meetings with other muni- <br />cipalities are believed to be necessary to become <br />fully acquainted with their water needs and plans. <br />We hope that your Board will make recommendations <br />for some type of committee to work with us on <br />this study as we certainly could use that kind of <br />help and knowledge. <br /> <br />Our work on the Narrows Unit has progressed <br />with basic data collection and extensions of water <br />supply and water requirement studies for the <br />period 1931 to 61. Our earlier site selection <br />studies were based upon the short period from <br />1952 to 57 and we feel it desirable to redo our <br />hydrology on a longer period. <br /> <br />I <br /> <br />Upon your request we have made studies of the <br />Riverside and North Sterling Pump Units and the <br />results of the best alternate for Riverside and <br />North Sterling Pump Units will be presented to <br />the South platte River Steering Committee on <br />September 13th, their next meeting. <br /> <br />We have also conducted Senator Allott over <br />the Weld County site, together with local people, <br />the 1st of August. This completes the Senator's <br />inspection of the two sites. He reviewed the <br />Narrows site at an earlier visit. <br /> <br />He plan to start accumulating data for econo- <br />mic studies this month. However, the work on the <br />
The URL can be used to link to this page
Your browser does not support the video tag.