My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BOARD02138
CWCB
>
Board Meetings
>
Backfile
>
2001-3000
>
BOARD02138
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/16/2009 3:12:44 PM
Creation date
10/4/2006 7:11:34 AM
Metadata
Fields
Template:
Board Meetings
Board Meeting Date
9/11/1963
Description
Minutes
Board Meetings - Doc Type
Meeting
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
93
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />Our field personnel met with personnel from <br />our Salt Lake City office and Fish and wildlife <br />Service to establish.a minimum operating pool for <br />Ruedi Reservoir. Agreement was reached that this <br />minimum pool elevation should be at 7590 feet. <br />This will result in a minimum surface area of <br />approximately 200 acres for fishery and recrea- <br />tion purposes. <br /> <br />I <br /> <br />Our field personnel met with representatives <br />of Bechtel Corporation, representing Homestake <br />interests, and agreed to make a fully integrated <br />operational study with Homestake water. Routing <br />will be via the Fryingpan-Arkansas system on the <br />eastern slope - to below Twin Lakes and then <br />over Trout Creek Pass. We expect to complete <br />this study in October. <br /> <br />We are advancing our work on repayment con- <br />tract with the Southeastern Colorado Water Con- <br />servancy District and hope to begin negotiations <br />with the District in October this year on the <br />details of this contract. <br /> <br />We are gathering information on conditions <br />in the Arkansas Valley insofar as drouth and <br />reclamation are concerned during the 1963 crop <br />year. We hope to document this information to <br />be incorporated in project records for future use. <br /> <br />In the activities of our Kansas River Basin <br />Office, I would like to report that representa- <br />tives of that office and our Chief Engineer's <br />office conducted a field inspection of the Wray <br />Dam and Reservoir site to review the previous <br />explorations. The damsite and local construction <br />materials were inspected and a drilling program <br />for exploration of the borrow areas was scheduled <br />and access easements acquired so that the work <br />could be computed. <br /> <br />I <br /> <br />Representatives of the Colorado Game and <br />Fish Commission, National Park Service, and the <br />Bureau of Reclamation conducted the annual in- <br />spection of the recreational areas at the Bonny <br />Reservoir on June 20. No recent planning activi- <br />ties have taken place on the St. Francis Unit. <br />
The URL can be used to link to this page
Your browser does not support the video tag.