My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BOARD02138
CWCB
>
Board Meetings
>
Backfile
>
2001-3000
>
BOARD02138
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/16/2009 3:12:44 PM
Creation date
10/4/2006 7:11:34 AM
Metadata
Fields
Template:
Board Meetings
Board Meeting Date
9/11/1963
Description
Minutes
Board Meetings - Doc Type
Meeting
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
93
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />.JJ I ""1: <br /> <br />MR. STAPLETON: <br /> <br />for which the state advanced $30,000. We have <br />$30,000 included in our appropriations this year <br />to match that amount, to complete certain studies <br />with reference to the use of water from Ruedi <br />Reservoir. This work is well under way. We <br />have completed our topographic surveys, founda- <br />tion drilling and other work at Missouri Heights <br />Reservoir, the storage unit for the Basalt Proj- <br />ect, and we are going ahead with that work. <br /> <br />I <br /> <br />On the Animas-La Plata Project, I see that <br />is an item for discussion so I will not go into <br />that matter. The Dolores Project is essentially <br />the same as reported to you at the last meeting. <br />Also there is no change that I know of on our <br />Bostwick Park, Fruitland Mesa and Savery-pot Hook <br />. proj ects . <br /> <br />Our work on the San ~tiguel Project, West <br />Divide Project. and Dallas Creek Project is about <br />on schedule. You will note that under the West <br />Divide Project we have changed a completion date <br />from 1965 to 1964. We hope to have our report <br />substantially completed in our office in fiscal <br />year 64, but I still believe it will be probably <br />65 before we can get a report out to the states <br />for the preliminary field review. <br /> <br />Other projects, the Yellow Jacket, Battlement <br />Mesa, Bluestone, and Grand Mesa, which are in the <br />process of investigation, I think our work is all <br />about on schedule and moving ahead quite well. <br /> <br />Moving down to the last item, Small Reclama- <br />tion Projects, the Orchard City Irrigation Dis- <br />trict has completed confirmation of the repayment <br />contract with us and are ready to go ahead with <br />their project. The last remaining thing to be <br />accomplished is to negotiate a contract for I <br />energy for pumping required for this project. As <br />yet, they have not been able to complete that con- <br />tract. We anticipate it will be done very shortly. <br /> <br />I believe that completes my report, 11r. <br />Chairman." <br /> <br />"Thank you, Bob. First of all, in behalf of <br />
The URL can be used to link to this page
Your browser does not support the video tag.