<br />restriction on the reservoir wltil an emergency spillway is completed, The Riverside Reservoir and Land <br />Company contracted with W,W, Wheeler and Associates of Denver to prepare construction plans and <br />specifications, The State Engineer's office and the Riverside Reservoir and Land Company are currently <br />evaluating altemate spillway sizes, Construction of the project is currently on-hold, pending resolution of the <br />spillway size and downstream property issues, <br /> <br />4, Tilton Lateral Incorporated - Tilton Lateral Rehabilitation <br /> <br />Authorization: Small Project Loan <br />Water Source: GVIC Mainlain <br />Terms of Loan: $100,000 @ 3,5% for 30-years <br /> <br />County: Mesa <br />Project Yield: 960 acre-feet <br />Project Type: Lateral Rehabilitation <br /> <br />The Tilton Lateral is located offheadgate No, 160 of the Grand Valley Irrigation Canal (GVle), which <br />is located in southeast Grand Junction, The Tilton Lateral Company operates the lateral to supply 36 <br />shareholders water to irrigate a 177 -acre service area, The existing lateral is in poor condition and delivers only <br />one half of its allocated water. The proj ect involves the construction of a new concrete inlet structure at the UP <br />Railroad crossing, the placement of 2,500 linear feet of low head pipe, and the replacement of 10,000 linear feet <br />of existing concrete ditch with high head pipe, The project is currently being designed by the NRCS Grand <br />JWlction Office, and is tentatively scheduled to be constructed in the fall of2002, <br /> <br />5, EI Paso Countv Water Authoritv - Countv Water Master Plan <br /> <br />Authorization: Grant <br />Water Source: n/a <br />Terms of Loan: $200,000 <br /> <br />County: EI Paso <br />Project Yield: n/a <br />Project Type: Water Master Plan <br /> <br />This project is a five-year program of technical studies aimed at the development of a long range, <br />countywide water master plan, The purpose of the plan is to develop water resources, systems, and facilities <br />in whole or in part for the benefit of the Authority members and their inhabitants, and other residents of the <br />county, now and into the future, The County is currently focusing on eight study areas; EI Paso County <br />water resources, potential water import projects, optimum county water distribution infrastructure, water plan <br />for private well owners, water reuse projects, synergistic projects with Colorado Springs utilities, other <br />studies, and an overall project master plan summary, The Water Authority has completed Phases 1, 2A, 2B, <br />3, 4B, 4C, 4D, and 4E ofthe Master Plan, The overall Master Plan is approximately 80% complete, <br /> <br />6, Weld County Tri-Area Sanitation District - Regional Detention Pond <br /> <br />Authorization: HB 00-1419 <br />Water Source: n/a <br />Terms of Loan: $1,500,000 @ 5,00% for 30-years <br /> <br />COWlty: Weld- S, of Frederick <br />Project Yield: n/a <br />Project Type: Regional Detention Pond <br /> <br />The communities of Dacono, Frederick, Evanston, and Firestone have consistently experienced <br />flooding problems due to storm runoff from irrigated farmlands and adjacent developments, These <br />communities have suffered many recorded flooding events, dating back to 1957, which caused in excess of <br />$300,000 in flood related damages, With significant population growth occurring within the District, the <br />District cooperated in the development of the 1-25 Corridor Master Drainage Plan, The master drainage plan <br />recommended that the existing detention pond located on the south side of Frederick be enlarged to a <br />regional detention pond, to mitigate future flood damage to the surrounding communities, The regional <br /> <br />42 <br />