<br />restriction on the reservoir wltil an emergency spillway is completed, The Riverside Reservoir and Land
<br />Company contracted with W,W, Wheeler and Associates of Denver to prepare construction plans and
<br />specifications, The State Engineer's office and the Riverside Reservoir and Land Company are currently
<br />evaluating altemate spillway sizes, Construction of the project is currently on-hold, pending resolution of the
<br />spillway size and downstream property issues,
<br />
<br />4, Tilton Lateral Incorporated - Tilton Lateral Rehabilitation
<br />
<br />Authorization: Small Project Loan
<br />Water Source: GVIC Mainlain
<br />Terms of Loan: $100,000 @ 3,5% for 30-years
<br />
<br />County: Mesa
<br />Project Yield: 960 acre-feet
<br />Project Type: Lateral Rehabilitation
<br />
<br />The Tilton Lateral is located offheadgate No, 160 of the Grand Valley Irrigation Canal (GVle), which
<br />is located in southeast Grand Junction, The Tilton Lateral Company operates the lateral to supply 36
<br />shareholders water to irrigate a 177 -acre service area, The existing lateral is in poor condition and delivers only
<br />one half of its allocated water. The proj ect involves the construction of a new concrete inlet structure at the UP
<br />Railroad crossing, the placement of 2,500 linear feet of low head pipe, and the replacement of 10,000 linear feet
<br />of existing concrete ditch with high head pipe, The project is currently being designed by the NRCS Grand
<br />JWlction Office, and is tentatively scheduled to be constructed in the fall of2002,
<br />
<br />5, EI Paso Countv Water Authoritv - Countv Water Master Plan
<br />
<br />Authorization: Grant
<br />Water Source: n/a
<br />Terms of Loan: $200,000
<br />
<br />County: EI Paso
<br />Project Yield: n/a
<br />Project Type: Water Master Plan
<br />
<br />This project is a five-year program of technical studies aimed at the development of a long range,
<br />countywide water master plan, The purpose of the plan is to develop water resources, systems, and facilities
<br />in whole or in part for the benefit of the Authority members and their inhabitants, and other residents of the
<br />county, now and into the future, The County is currently focusing on eight study areas; EI Paso County
<br />water resources, potential water import projects, optimum county water distribution infrastructure, water plan
<br />for private well owners, water reuse projects, synergistic projects with Colorado Springs utilities, other
<br />studies, and an overall project master plan summary, The Water Authority has completed Phases 1, 2A, 2B,
<br />3, 4B, 4C, 4D, and 4E ofthe Master Plan, The overall Master Plan is approximately 80% complete,
<br />
<br />6, Weld County Tri-Area Sanitation District - Regional Detention Pond
<br />
<br />Authorization: HB 00-1419
<br />Water Source: n/a
<br />Terms of Loan: $1,500,000 @ 5,00% for 30-years
<br />
<br />COWlty: Weld- S, of Frederick
<br />Project Yield: n/a
<br />Project Type: Regional Detention Pond
<br />
<br />The communities of Dacono, Frederick, Evanston, and Firestone have consistently experienced
<br />flooding problems due to storm runoff from irrigated farmlands and adjacent developments, These
<br />communities have suffered many recorded flooding events, dating back to 1957, which caused in excess of
<br />$300,000 in flood related damages, With significant population growth occurring within the District, the
<br />District cooperated in the development of the 1-25 Corridor Master Drainage Plan, The master drainage plan
<br />recommended that the existing detention pond located on the south side of Frederick be enlarged to a
<br />regional detention pond, to mitigate future flood damage to the surrounding communities, The regional
<br />
<br />42