My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BOARD02099
CWCB
>
Board Meetings
>
Backfile
>
2001-3000
>
BOARD02099
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/16/2009 3:11:53 PM
Creation date
10/4/2006 7:10:28 AM
Metadata
Fields
Template:
Board Meetings
Board Meeting Date
5/20/2002
Description
CWCB Director's Report
Board Meetings - Doc Type
Memo
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
61
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />detention pond would encompass over 60 acres ofland and store approximately 146 acre-feet of storm water <br />during a 100-year event, The design is being conducted by the Sears-Brown Group, and should be complete <br />by May of 2002, with construction tentatively scheduled to commence in June of 2002, <br /> <br />7, Larimer County - Drv Creek Multi-Objective Floodplain Project, <br /> <br />Authorization: SB 96-152, Amended SB 97-8 <br />Water Source: Dry Creek Basin <br />Terms of Loan: $920,000 @4,25% for 30-years <br /> <br />County: Larimer - N, of Ft. Collins <br />Project Yield: N/A <br />Project Type: Flood Mitigation <br /> <br />Dry Creek is located north of Fort Collins, with a majority of its 75 square miles of drainage basin <br />area located within Larimer County, The uppermost portion of the basin consists of rangeland and irrigated <br />pastures, The lower portion of the basin within the city limits of Fort Collins consists of commercial, <br />industrial, and residential development. Over the years the lower 2/3 of the Dry Creek floodplain corridor <br />has almost been completely eliminated due to development. The 100-year runoff for Dry Creek is 5,022 <br />cfs, The intent of the project is to control floodwaters in the upper basin area by means of detention <br />facilities to reduce the peak discharge from 5022 cfs to 500 cfs above the Weld Canal, utilize a specific reach <br />of the Weld Canal to transport the 500 cfs, and construct approximately 1.5 miles of new open channel from <br />the Weld Canal to a designated point along Dry Creek, located downstream of existing development, The <br />proposed improvements would remove over 800 structures out of the Dry Creek regulatory 100-year <br />floodplain, The project is currently in the feasibility/preliminary design phase, Project loan approval was <br />granted by the Board at the November 2001 Board Meeting, The project tentatively scheduled for <br />construction in the fall/winter of 2002/2003, <br /> <br />8, Pine River Irrigation District - Pump and Pipeline Project <br /> <br />Authorization: HB 00-1419 Severance Tax <br />Water Source: Pine River <br />Terms of Loan: $341,000 @3,50% for 20-years <br /> <br />County: La Plata <br />Project Yield: 1,600 acre-feet <br />Project Type: Distribution System <br /> <br />The Pine River Irrigation District operates Vallecito Reservoir on the Pine River located approximately <br />15 miles north of the Town of Bayfield, The eastem half of La Plata County is considered a water critical area, <br />meaning that all of the water in the basin is used during certain periods, Most of the people in this area are <br />utilizing growldwater resources that have limited quantity and are of relative poor quality, The purpose of the <br />project is to provide a rural water system that is adequate in quantity and quality to the water critical areas in La <br />Plata COWlty, The overall project has many components, however, this particular loan is for diverting water <br />from Vallecito Reservoir to a pressurized treatment plant The proposed project involves tapping into the <br />existing outlet tW111el, constructing a 500 foot pipeline to convey water to the treatment plant, a bridge over the <br />spillway chute, and a pump when the reservoir water level is low or to pressurize the treatment plant. The <br />project currently on-hold pending resolution of other outside funding issues, <br /> <br />9, Dolores Water Conservancv District - WETP ACK <br /> <br />Authorization: <br />Water Source: <br />Terms of Loan: <br /> <br />SB 01-157 <br />Dolores River <br />$7,260,000 @3,50% for 30-years <br /> <br />43 <br /> <br />County: Montezuma <br />Project Yield: 7,840 acre-feet <br />Project Type: Distribution System <br />