<br />This project involves the rehabilitation of Victor No, 2 Reservoir, which is the existing municipal <br />water supply for the City of Victor. Cracks in the dam embankment were discovered in 1984 and the <br />spillway was lowered in the response to restrictions by the State Engineer's Office, The lowering of the <br />spillway resulted in loss of storage of approximately 23 acre-feet, The existing spillway is inadequate per <br />the current Rules for Dam Safety, The City is concemed that the State Engineer's Office may place further <br />restrictions on the reservoir if the dam is not rehabilitated, The City has hired the [mal design plans to be <br />prepared by Knight Piesold, Denver, Colorado, The design has been completed and has been approved by <br />the State Engineer's Office, The project was bid in the fall of2001 with no successful award, The project is <br />scheduled to be re-bid in February of 2002, Tentative construction start date is May of 2002, <br /> <br />Proiects Under Desil!n <br /> <br />1. Rvan Gulch Reservoir Companv - Rvan Gulch Dam Rehabilitation <br />Authorization: SB 99-173 COWlty: Larimer - S, of Loveland <br />Water Source: Big Thompson River Project Yield: 645 ac,ft, <br />Terms of Loan: $317,500 @4,25% for 30 years Project Type: Dam Rehabilitation <br /> <br />This project is the rehabilitation of the Ryan Gulch Dam which includes the construction of a new <br />spillway, lining the upstream face of the dam with a clay liner, sleeving the existing 24-inch outlet pipe, and <br />constructing a new upstream controlled inlet works, Boyle Engineering, lnc, of Denver has completed the <br />final design plans, which has been reviewed and approved by the State Engineer's Office, Bids were <br />received to construct the planned improvements, but were outside the project budget. The Ditch Company <br />is currently obtaining a new design engineer to redesign certain aspects of the project in an attempt to reduce <br />the overall cost of the job, The project is currently on-hold pending the outcome of the Ditch Company's <br />redesign ofthe reservoir. <br /> <br />2, Loveland. Citv of - Green Ridge Glade Reservoir Rehabilitation <br /> <br />Authorization: HB 98-1189 <br />Water Source: Big Thompson River <br />Terms of Loan: $5,000,000 @ 4,75% for 10 yrs, <br /> <br />COWlty: Larimer - W, of Loveland <br />Project Yield: 6,000 acre-feet <br />Project Type: Dam enlargement <br /> <br />This $19,2 million project is the enlargement of the Green Ridge Glade Reservoir northwest of <br />Loveland, The project consists of raising the crest of the existing dam approximately 60 feet, construction ofa <br />new concrete labyrinth weir spillway, and new multi-level intake gate tower outlet structure, The City has <br />contracted with Woodward-Clyde of Denver to prepare the [mal design and construction contract documents, <br />Environmental studies have been complete and the City is currently in the process of obtaining the necessary <br />permits to realign the adjacent County Road, The design is scheduled to be complete by JWle of 2002, with <br />construction to follow in the fall of 2002. <br /> <br />3, Riverside Reservoir and Land Companv - Riverside Reservoir Spillwav Rehabilitation <br /> <br />Authorization: SB 98-1189 <br />Water Source: South Platte River <br />Terms of Loan: $450,000 @ 3,75% for 20 yrs, <br /> <br />COWlty: Weld- NW of Wiggins <br />Project Yield: 200 ac,ft, <br />Project Type: Spillway Rehabilitation <br /> <br />This project is the construction of an emergency spillway on the Riverside Reservoir Dam, located 11 <br />miles northwest of Wiggins in Weld County, The State Engineer has placed a storage <br /> <br />41 <br />