<br />Water Source: Cache La Poudre
<br />Terms of Loan: $1,107,000@ 4,04% for 20 yrs,
<br />
<br />Project Yield: 9,363 acre-feet
<br />Project Type: Reservoir Rehabilitation
<br />
<br />This project involves the rehabilitation of Reservoirs 4, 5 and Indian Creek. The Irrigation Company has
<br />retained the services of Smith Geotechnical, out of Fort Collins, Colorado to prepare design plans and
<br />specifications for the proposed improvements, Improvements to Reservoir No, 5 were designed and
<br />completed in 1999, Reservoir 4 is currently under design and is tentatively scheduled for construction in the
<br />fall of 2003, The proposed improvements to Indian Creek Reservoir involve a new 500-ft, long spillway,
<br />replacement of the outlet structure, new toe drains, and reshaping the downstream dam face, The proposed
<br />improvements to Reservoir No, 4 include, relocation of the spillway to the center of the dam, replacing the
<br />existing outlet structure and Parshall flume, new toe drains, rip rap placement, and reshaping the upstream
<br />face of the dam, The design for Indian Creek Reservoir is complete and construction was awarded to Zak
<br />Dirt, Longmont Colorado, Indian Creek Reservoir is anticipated to be completed by June of2002,
<br />
<br />7, Summit Reservoir and Irrigation Companv
<br />
<br />Authorization: SB-97-008
<br />Water Source: Lost Canyon Creek
<br />Terms of Loan: $200,000@3,75% for 30-years
<br />
<br />County: Montezuma - NE of Cortez
<br />Project Yield: 4,287 ac, ft,
<br />Project Type: Reservoir and Ditch Rehab,
<br />
<br />This $270,000 project is the rehabilitation ofthe Summit Reservoir Dam outlet works and the repair
<br />and improvements to the Summit Reservoir and Irrigation Company's water collection and distribution
<br />facilities, The Cortez office of Natural Resource Conservation Service prepared the construction plans and
<br />specifications, Construction for the Walker Drops improvements commenced in March of 1999, by Noland,
<br />Inc" of Mancos, CO" and was completed in July of 1999, The second to last I phase of the project has been
<br />designed and is currently under construction, That current project is anticipated to be complete by February
<br />of 2002, The overall project is anticipated to be completed by the spring of 2003,
<br />
<br />8, The Town of Monument - Monument Dam Rehabilitation
<br />
<br />Authorization: Severance Tax Trust Fund
<br />Water Source: Monument Creek
<br />Terms of Loan: $2,081,000 @5,50% for 30-years
<br />
<br />County: EI Paso - W, of Monument
<br />Project Yield: 450 acre-feet
<br />Project Type: Dam Rehabilitation
<br />
<br />Monument Lake is located on Monument Creek on the west side of the Town of Monument, The
<br />existing reservoir capacity is approximately 300 acre-feet, which is planned to be increased to 450 acre-feet
<br />be means of dredging, The existing lake is under limited storage by the State Engineer's Office, due to
<br />deteriorated outlet works, tree growth on the dam face, and inadequate slope protection and spillway
<br />capacity, The proposed project involves rehabilitating the spillway, outlet works, and dam embankment, to
<br />include; replacement of the existing outlet spillway chute below the spillway crest, removal and replacement
<br />of the top 10 feet of the dam embankment to clear all existing vegetation, replacement of the outlet works
<br />urith ~ npUl ?4._1n..l, dppl ninp ~nrl tl,p rpmrnml {)f ~nnr{)yim~tphT 1 ~() ()()() {,llh-if' u~rrl~ rI-f ~prl-impnt -frrnTI th""
<br />---- -- --- -. - - ----- -- - - - - r -r - 7 ------ ---- - - --- - . --- - - -or r - - -------- - - -,./ - - - 7 - - - - -- - - - ..I --- ---- - - -- - ------- --- -- - --- ----
<br />
<br />lake bottom, Boyle Engineering, of Littleton, Colorado, has completed the design and the project has been
<br />awarded to ASI, of Buena Vista, Colorado, The project in anticipated to be completed by June of 2002,
<br />
<br />9, Glenwood Irrigation Companv - Rehabilitation of Diversion and Headgate
<br />
<br />Authorization: Small Project Loan
<br />
<br />39
<br />
<br />County: Garfield
<br />
|