<br />Water Source: Cache La Poudre
<br />Terms of Loan: $2,357,000 @4,15% for 30 years
<br />
<br />Project Yield: 30,000 ac, ft,
<br />Project Type: CanaVRes, Rehabilitation
<br />
<br />In 1995 the Windsor Reservoir and Canal Company retained the services of Smith Geoteclmical to
<br />evaluate the current condition of their 25 miles of canal and 6 reservoirs, Smith Geoteclmical identified
<br />approximately $3,400,000 in recommended improvements, with a proposed design and construction time frame
<br />of 15-years, The projects identified consisted of the Poudre Valley Canal, Cobb Lake Pipeline and Outlet/Inlet
<br />Structures, Windsor Reservoir No, 8, Annex No, 8 and Elder Reservoir Outlet Structure, The Poudre Valley
<br />Canal and the Cobb Lake improvements have been designed and constructed, The design on Annex No, 8 and
<br />Windsor No, 8 are currently underway, The construction of Elder Reservoir commenced in May of 2001,
<br />constructed by Zak Dirt, from Longmont, CO, Elder Reservoir is tentatively scheduled to be completed by
<br />JWle of2002.
<br />
<br />4, Owl Creek Supplv and Ditch Companv - Hvdraulic Structure Rehabilitation
<br />
<br />Authorization: HB 00-1419
<br />Water Source: Cache La Poudre
<br />Terms of Loan: $450,000 @ 4,00% for 30-years
<br />
<br />COWlty: Weld-N, of Greeley
<br />Project Yield: 30,000 acre-feet
<br />Project Type: Structure Rehabilitation
<br />
<br />The Owl Creek Supply and Irrigation Company operates and maintains 12 miles ofthe Owl Creek
<br />Ditch, The existing hydraulic structures along the 12 miles of ditch, such as; check structures, drop
<br />structures, measuring weirs, flumes, gates, etc" have severely deteriorated over the years and are in the need
<br />of replacement, The proposed project involves the replacement of 14 major structures, 55 flumes, 10-meter
<br />gates, and 30 headgates, to be designed by Smith Geotechnical, Ft, Collins, Colorado, Construction
<br />commenced in November of2001 and is anticipated to be completed by June of 2002,
<br />
<br />5, Jackson Lake Reservoir and Irrigation Companv - Dam Rehabilitation
<br />
<br />Authorization: HB 01-157
<br />Water Source: South Platte River
<br />Terms of Loan: $2,700,000 @ for 30 years
<br />
<br />COWlty: Morgan - N,W, ofFt. Morgan
<br />Project Yield: 30,000 acre-feet
<br />Project Type: Dam Rehabilitation
<br />
<br />Jackson Lake Reservoir is located approximately 17 miles northwest of Fort Morgan and has an
<br />estimated storage capacity of 30,000 acre-feet, The dam has been in-place since 1902 and provides mainly
<br />late season irrigation water to about 17,000 acres of land, The dam is not currently under any restriction by
<br />the State Engineer's Office, but the SEO has indicated concem about the existing dam facing, The proposed
<br />project is to provide a renewed slope protection along the upstream face of the dam, The existing concrete
<br />slabs have deteriorated over time, due to the extreme wave action and general freeze-thaw, The major
<br />component of the project is new soil cement facing, approximately 3-4 feet thick, running along about 70%
<br />of the existing dam face (8,100-feet), The new soil cement will be poured directly over the existing
<br />concrete slabs and will extend several feet below the toe of the embankment. W, W, Wheeler of
<br />Englewood, Colorado is designing the project, at an estimated construction cost of $3,000,000, The project
<br />
<br />______ ________1__1._ AC1T _.C'''_1_____1_ E___CI''' """""AAA ,,_____.____.____ ______________1 ~__ A_______. _.C'''''''1 ____1~_
<br />Wd;:j dWdlUl;;U LV .1-\.0.1, U.l ,---"UIUHIUU, .IVl ..j)L,LVV,VVV. ,---"Ull;:jllUvllUll vUlllllll;;llvl;;U 111 J-\.Ue,U;:jl U.l LVVl dllU l;:j
<br />approximately 95% complete, The project is anticipated to be substantially complete by May of 2002,
<br />
<br />6, North Poudre Irrigation Companv - Reservoirs No, 4, 5 and Indian Creek Rehabilitation
<br />
<br />Authorization: HB 98-173
<br />
<br />COWlty: Weld - N, of Fort Collins
<br />
<br />38
<br />
|