Laserfiche WebLink
<br />, , <br />" <br /> <br />. <br /> <br />. <br /> <br />. <br /> <br />. <br /> <br />.Stlel:l Broll'l6rs, Inc. _ W8lI Augmentation p~ <br />Marctl25-26. 2003 <br /> <br />AQenda Item 24b <br /> <br />Water Project Construction Loan Program-Project Data <br /> <br />Borrower: <br /> <br />Stieb Brothers, Inc, <br /> <br />County: Logan <br /> <br />Project Name: SBI Recharge Project <br />Drainage Basin: South Platte <br />Total Project Cost: $202,000 <br /> <br />Project Type: Well Augmentation <br /> <br />Water Source: New wells <br /> <br />Funding Sources: CWCB <br /> <br />Type of Borrower: Agricultural <br /> <br />Aver. Delivery: 6000 acre-feet <br /> <br />cweB Small Project Loan: $151,500 <br /> <br />Interest Rate: 2.5% Term: 20 years <br /> <br />The S81 is a private family farm corporation located 10 miles north of Sterling in Logan County, near <br />the town of Iliff. 581 has approximately 723 acres of sprinkler irrigated fann grou"d. The ground is <br />IITigaled with 5 tributary groundwater wells, which were drilled In the late 19S0's and early' 970's, <br />The wells pump on average 1400 acre-feet annually. The water is typically used to Irrigate com, <br />alfalfa, beans and wheat. The 12 wells are currently augmented under the Groundwater <br />Appropriators of the South Platte (GASP plan of operation, SBI is complsteiy dependent on their 5 <br />wells, whlch have very junior water rights. S81 has been using GASP to replace depletions from <br />well pumping when there is a senior water right -call" on the river. 581 plans to construct 2 wells to <br />pump water Into a recharge ponds In the wlnter months when there Is not a call on the river. Water <br />from the ponds would have a delayed retum to the river In summer months when 581 has <br />depletions that need to be offset with augmentation water. The wells, drilled near the South Platte <br />River, would pump up to a combined rate of 13.4 cts (producing up to 6000 acre feet annually. <br />They would pump to the recharge ponds through 18 - underground piping. An existing well away <br />from the river, near the recharge pond would be converted for augmentation, and the piping used to <br />return "stored- water to the river when necessary. ~. <br /> <br />;;"\ <br />f_..'., <br />,-,.;1>' <br /> <br /> <br />. <br /> <br />. <br />. <br />, <br /> <br />. <br />... ,.." . <br />,~ <br /> <br />.' <br /> <br />. <br />. <br />, <br /> <br />.. <br /> <br />., <br />.' <br /> <br />, <br />. <br /> <br />i~ <br /> <br />'~. 00..," <br /> <br /> <br />, <br />.' <br /> <br />., <br /> <br />n.. <br />~/:J J. <br /> <br />. , <br /> <br />lANDS <br /> <br />-,-, <br />- <br /> <br />Location Map <br />