My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BOARD02097
CWCB
>
Board Meetings
>
Backfile
>
2001-3000
>
BOARD02097
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/16/2009 3:11:49 PM
Creation date
10/4/2006 7:10:11 AM
Metadata
Fields
Template:
Board Meetings
Board Meeting Date
1/27/2004
Description
CF Section - Design and Construction Status Report
Board Meetings - Doc Type
Memo
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
33
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />" <br /> <br />Slit Water Conservancy Dist1ct <br />March 2'-26. 2003 <br /> <br />AQenda Item 24a. <br />(updated March 27, 2003) <br /> <br />Water Projset Construction Loan Program-Projset Data <br /> <br />. <br /> <br />Borrower: Silt Water Conservancy District <br /> <br />County: Garfield <br />Project Type: Pump Plant Rehabilitation <br /> <br />Project Name: Transfonner Replacement <br /> <br />Drainage Basin: <br /> <br />Colorado River <br /> <br />Water Source: Colorado River <br /> <br />Total Project Cost: $540,100 <br /> <br />Funding Sources: ewes and District <br /> <br />Type of Borrower: Agricultural <br /> <br />Median Household Income: N/A <br /> <br />CWCS Loan: $488,000 <br /> <br />Interest Rate: 2.75% Term: 30 years <br /> <br />CWCB Grant: $5,000 <br /> <br />Average water pumped per Year: 4,000 acre-feet <br /> <br />, <br /> <br />The Silt Water Conservancy District operates a pump plant on the Colorado River to deliver water to <br />its Pump Canal, which serves agricultural users on the lower reaches of Silt Mesa. The pump plant <br />was built in the mid 1960's, and is located 2 miles east of the Town of Silt. It has a capacity of 36 <br />CFS. and delivers an average of 4,000 acre-feet per year. The pump plant transformer must be <br />replaced due to an upgrade of the transmission line by Xcel Energy, Western Area Power <br />Administration will design the project in 2003, and construction will be completed in 2004. The District <br />has completed the feasibility study using information from the preliminary design. Proposed funding . <br />for the project consists of a $486,000 Small Project Loan and a $5.000 Feasibility Study Grant from <br />the CWCB, a $15,000 planning grant from the Bureau of Reclamation, and the remainder from the <br />District. <br /> <br /> <br />~~.,~ <br />. <br />.~ <br /> <br />., <br />, <br /> <br />.. <br /> <br />-" <br /> <br />. <br /> <br />Loeation Map <br />
The URL can be used to link to this page
Your browser does not support the video tag.