My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BOARD02097
CWCB
>
Board Meetings
>
Backfile
>
2001-3000
>
BOARD02097
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/16/2009 3:11:49 PM
Creation date
10/4/2006 7:10:11 AM
Metadata
Fields
Template:
Board Meetings
Board Meeting Date
1/27/2004
Description
CF Section - Design and Construction Status Report
Board Meetings - Doc Type
Memo
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
33
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />. <br /> <br />. <br /> <br />. <br /> <br />Low- ~ DItctI Company <br />January 22.23, 2003 <br /> <br />AQenoa Item 19h <br /> <br />Water Project Construction Loan Program-Project Data <br /> <br />Borrower: Low Line Ditch Company <br /> <br />County: Logan <br /> <br />Project Name: Augmentation Project <br /> <br />Project Type: Well Augmentation <br /> <br />Drainage Basin: <br /> <br />South Platte River <br /> <br />Water Source: South Platte River <br /> <br />Total Project Cost: $105,000 <br /> <br />Funding Sources: ewes and Company <br /> <br />Type of Borrower: Agricultural <br /> <br />Median Household Income: N/A <br /> <br />CWCB Loan: $94,500 <br /> <br />Interest Rate: 2.75% Term: 30 years <br /> <br />CWCB Grant: $1,500 <br /> <br />Annual Diversions: 6,650 acre-feet <br /> <br />The Low Line Ditch Company operates the Lowline Ditch for delivery of irrigation water within a <br />2,070.acre service area. The headgate for the ditch is located in Logan County, at the TO'M"l of <br />Ster1ing. This project indudes construction of 4 augmentation ponds and drilling one <br />augmentation well to generate augmentation credits to cover depletions for 13 irrigation wells <br />used by stockholders of the Company. The project will be completed in winter 2003. Brent Nation. <br />P.E., of Nation Engineering Services has completed the feasibility study. Proposed funding for <br />the project consists of? $94,500 Small Project Loan and a $1,500 Feasibility Study Grant from <br />the eWeB. and the remainder from the Borrower. <br /> <br /> <br />. <br /> <br />,- <br />., <br />, ,'. <br /> <br />.. <br /> <br />, .. to <br /> <br /> ." <br /> .. <br /> , " <br /> . <br /> , <br /> .., <br /> , <br /> .., <br /> , <br /> . <br /> . <br />~ . <br /> . <br /> . . <br />.. <br /> <br />.. <br /> <br />" <br /> <br />.. <br /> <br />. <br />. <br /> <br />. <br /> <br />Location Map <br />
The URL can be used to link to this page
Your browser does not support the video tag.