Laserfiche WebLink
<br />La~e Meredith ReseI'V'Oir Co. <br />MarCh 24.26, 2003 <br /> <br />Agenda Item 24c. <br />(Updaled Mardi 27, 2003) <br /> <br />Water Project Construction Loan Program-Project Data <br /> <br />. <br /> <br />Borrower: Lake Meredith Reservoir Company <br /> <br />County: Crowley <br /> <br />Project Name: OuUet Canal Relocation <br /> <br />Project Type: Reservoir Modification <br /> <br />Drainage Basin: Arkansas River <br /> <br />Water Source: Arkansas River <br /> <br />Total Project Cost: $1,524,880 Funding Sources: CWCS, Bank, and Company <br /> <br />Type of Borrower: Municipal-Agricultural Median Household Income: Blended <br /> <br />CWCB Loan: $1,000,000 <br /> <br />Blended Interest Rate: 4% Term: 30 years <br /> <br />CWCS Grant: $5,000 <br /> <br />Total Reservoir Volume: 41,000 acre-feet <br /> <br />The Lake Meredith Reservoir Company operates Lake Meredith for storage of water that is <br />used for agricultural, municipal, domestic. and other beneficial uses. Water is received through <br />the Colorado Canal, with headgate on the Arkansas River. This project involves relocation of 5 <br />miles of outlet canal to allow the Company to utilize an additional 18.000 acre-feet of storage in <br />Lake Meredith. The project will be completed in Spring-Fall 2003. Steven Steffens, P.E. of <br />Steffens and Associates, Inc., has completed the feasibility study. Proposed funding for the <br />project consists of a $1,000,000 Small Project Loan and a $5,000 Feasibility Study Grant from . <br />the ewes. a $500,000 loan from the First National Sank of Ordway, and the remainder from <br />the Company. <br /> <br /> <br />r <br /> <br />"r- J I <br /> <br />" . <br /> <br />..... -' <br /> <br />.. <br /> <br />-, <br /> <br />'. <br /> <br />-, <br /> <br />-- <br /> <br />.,,: <br /> <br /> <br />/,- <br />,~I <br /> <br />" <br />---j-- <br /> <br />,,~ <br /> <br />," <br /> <br />:,;c:.._~ <br /> <br /> <br />; <br />'. j.- <br /> <br />. <br /> <br />Location Map <br />