<br />In 1998 the State Engineer's Office restricted the storage height of the reservoir to be 9-ft. below the crest of <br />the dam, reducing the storage capacity from 230 acre,ft. to 120 acre-ft. The storage restriction was due to excessive <br />seepage and the poor condition of the spillway, Harrison Western Construction, and designlbuild group out of _ <br />Denver, Colorado, was retained by the Town to design and construct the necessary improvements to restore the dam to_ <br />its original storage capacity of230 acre-feet. The proposed improvements include, constructing a compacted earthfill <br />liner on the upstream slope of the reservoir and floor, construct new toe drains, raise the embankment dam crest by <br />2.5-ft., place rip rap and liner protection material above the earthfillliner, spillway repairs, and fill the old borrow pit <br />within the reservoir. Harrison Western Construction has commenced construction in rehabilitating the dam face and <br />will continue working as weather permits, Project is anticipated to be completed in the Fall of 2002, <br /> <br />4, Highland Ditch Companv - Foothills Reservoir Dam Rehabilitation <br /> <br />Authorization: SB 98,1198 - Severance Tax County: Boulder - W of Longmont <br />Water Source: St. Vrain River Project Yield: 450 ac,ft, <br />Terms of Loan: $1,040,000 @4,O% for 30 years Project Type: Dam Rehabilitation <br /> <br />This project is the rehabilitation of Foothills Reservoir dam, located west of Longmont in Boulder County, <br />The dam has an inadequate spillway and severe seepage through the embankment and has had a storage restriction <br />placed on it by the State Engineer. Smith Geotechnical Engineering Consultants of Fort Collins Colorado prepared the <br />final design plans and specifications, The proposed improvements include a new spillway, a sand filter blanket along <br />the downstream face of the dam, a perimeter toe drain with flow measuring devices, rip rap placement along the <br />upstream face of the dam, and reconstructing the dam cres!. The project was awarded to Zak Dirt, out of Longmont, <br />Colorado, who commenced construction in December of 2000 and is approximately 99% complete, The project is <br />anticipated to be completed by February of2002, <br /> <br />5, Tunnel Water Companv - Laramie/Poudre Tunnel RehabilItation <br /> <br />Authorization: Emergency Loan County: Larimer, W. ofF!. Collins <br />Water Source: Laramie River Project Yield: 15,085 ac, ft. <br />Terms of Loan: $3,680,000@4.75% for 30-yearsProject Type: Tunnel Rehabilitation <br /> <br />e <br /> <br />The existing Laramie/Poudre Tunnel is approximately2 miles in length, diverting water directly from the <br />Laramie River and discharging it into Poudre River at a point ~pproximately 60 miles west of Fort Collins, On May <br />28,2000, a 400-fl. section of the tunnel collapsed, leaving the tunnel inoperable, The proposed project involves the <br />construction of new access roads and staging areas at both end~ ofthe tunnel and the repair of the failed tunnel area, at <br />an estimated cost of $3,200,000. Rocky Mountain Consultant~, Longmont, Colorado, has completed the final design <br />and will be monitoring the project during construction, Robison Construction, Inc" (RCI) the Contractor, commenced <br />construction in December of2000, and is tentatively scheduled to be complete in March of2002, The project is <br />currently 85% complete, <br /> <br />6. Windsor Reservoir and Canal Companv - Various Canal and Reservoir Rehabilitations <br /> <br />Authorization: SB 96-153 <br />Water Source: Cache La Poudre <br />Terms of Loan: $2,357,000 @4,15%for30years <br /> <br />County: Larimer- N, ofFt. Collins <br />projebt Yield: 30,000 ac, ft. <br />Project Type: Canal/Res, Rehabilitation <br /> <br />In 1995 the Windsor Reservoir and Canal Company retained the services of Smith Geotechnical to evaluate <br />the current condition of their 25 miles of canal and 6 reservoirs, Smith Geotechnical identified approximately <br />$3,400,000 in recommended improvements, with a proposed design and construction time frame of IS-years, The <br />projects identified consisted of the Poudre Valley Canal, CobbjLake Pipeline and Outlet/Inlet Structures, Windsor <br />Reservoir No.8, Annex No.8 and Elder Reservoir Outlet Structure. The Poudre Valley Canal and the Cobb Lake _ <br />improvements have been designed and constructed, The desiltn on Annex No.8 and Windsor No.8 are currently _ <br />underway, The construction of Elder Reservoir commenced in: May of 200 I, constructed by Zak Dirt, from Longmont, <br />CO. Elder Reservoir is tentatively scheduled to be completed by February of2002. <br />