<br />Feasibility investigations on the Basalt <br />Project are continuing and we are scheduled <br />to have the feasibility report completed in <br />FY 1971. <br /> <br />Feasibility investigations have now been I <br />initiated on the Lower Yampa, or Juniper, <br />Project plan. Initially studies will be made <br />of the mineral, land and water resources <br />along the Yampa River and its tributaries to <br />determine water development needs. Recently <br />the Colorado River Water Conservation District <br />and the Great Northern Water conservancy <br />District notified us that they would have <br />funds available sometime after January, 1969, <br />to transfer to the Bureau to assist in these <br />feasibility investigations during 1969. <br /> <br />Data are being collected and assembled <br />for salinity control studies. Preparation <br />of a reconnaissance report will be completed <br />this fiscal year. This study is being made <br />in cooperation with the Federal Water Pollu- <br />tion Control Administration. <br /> <br />preconstruction activities on the Fruit- <br />land Mesa Project are progressing satisfac- <br />torily. A draft of the repayment contract <br />has been approved for negotiations with the <br />Fruitland Mesa Water conservancy District. <br />These negotiations are under way. Other <br />preconstruction activities in progress con- <br />sist of collection of data for specification <br />designs and estimates for Gould Canal struc- <br />tures and Fruitland Mesa Canal Diversion Dam <br />and studies pertaining to new farm units. <br /> <br />Advance planning activities on the <br />Savery-Pot HOOK Project are well advanced <br />or completed in various areas of study such <br />as plan formulation, land classification and <br />drainage investigations, geologic studies, <br />and field surveys. The definite plan report <br />is scheduled to be completed in the fall of <br />1970. <br /> <br />I <br />