My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BOARD02033
CWCB
>
Chatfield Mitigation
>
Board Meetings
>
Backfile
>
2001-3000
>
BOARD02033
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/16/2009 3:10:20 PM
Creation date
10/4/2006 7:08:21 AM
Metadata
Fields
Template:
Board Meetings
Board Meeting Date
5/8/1963
Description
Minutes
Board Meetings - Doc Type
Meeting
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
100
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />unfortunately I think that is one of our proj- <br />ects where we have a very short water supply <br />and I doubt that the reservoir will fill this <br />year. <br /> <br />The event of good weather in mid-March or <br />a little later allowed the contractor to proceed <br />on the Lemon Dam of the Florida project as well <br />as on the Florida Farmers Ditch Diversion Dam <br />and Canal. <br /> <br />I <br /> <br />That completes the <br />struction is concerned. <br />now to Advance Planning <br /> <br />portion as far as con- <br />I would like to go on <br />work. <br /> <br />Our drilling work on Rifle Gap Dam is sub- <br />stantially completed. Design data is presently <br />being sent to our Chief Engineer for final de- <br />signs for this structure. We have, I think, com.... <br />pleted principal arrangements. Frank has just <br />got out his announcements for the election neces- <br />sary to ratify the contract with this District <br />and I think we'll go right ahead on that phase of <br />it. <br /> <br />As we previously mentioned, the report on <br />the Crystal Dam and Powerplant, an additional unit <br />to the Curecanti Project, has been completed and <br />sent to the Bureau of the Budget for their com- <br />ments. <br /> <br />Moving on to General Investigations, I think <br />we have also reported this previously, our recon- <br />naissance reports on the Ruedi-western Slope <br />Investigations and on the Parshall Project inves- <br />tigations were completed in January 1963, and for- <br />warded to the commissioner's office. I think the <br />comments on that from everybody have been re- <br />ceived and I think the necessary revisions have <br />been made and that report is about ready for <br />release. We anticipate the completion of the <br />Juniper project reconnaissance report this month. <br />,'Ie have also completed in our office the initial <br />draft of the Upper Gunnison Basin project. That <br />is scheduled for completion before the end of <br />this fiscal year. <br /> <br />I <br />
The URL can be used to link to this page
Your browser does not support the video tag.